Basic Installation With Cooperative Testing Sample Clauses

The "Basic Installation With Cooperative Testing" clause outlines the responsibilities and procedures for installing a product or system, with an emphasis on collaborative testing between the provider and the client. Typically, this clause specifies that the provider will perform the initial installation and both parties will jointly conduct tests to confirm that the installation meets agreed-upon standards or requirements. For example, after setting up software, both the vendor and customer might work together to verify its functionality in the actual operating environment. The core purpose of this clause is to ensure that installation is completed correctly and that any issues are identified and resolved through cooperative effort, thereby reducing misunderstandings and ensuring the delivered product meets expectations.
Basic Installation With Cooperative Testing. Basic Installation With Cooperative Testing may be ordered for new or existing Unbundled Loops. 9.2.2.9.5.1 For an existing End User Customer, Basic Installation With Cooperative Testing is a "lift and lay" procedure with cooperative testing on the Due Date. The COT "lifts" the Loop from its current termination and "lays" it on a new termination connecting to CLEC. Upon completion of CenturyLink performance testing, the CenturyLink Implementor/Tester will contact CLEC, read the CenturyLink test results, and begin CLEC cooperative testing. Within two (2) business days, CenturyLink will email the CenturyLink test results to a single, designated CLEC office email address. CLEC and CenturyLink will perform a loop back acceptance test, accept the Loop and exchange demarcation information. 9.2.2.9.5.2 For new End User Customer service, Basic Installation With Cooperative Testing may require a dispatch to the End User Customer premises. The COT and Field Technician complete circuit wiring and perform the required performance tests to ensure the new circuit meets the required parameter limits. 9.2.2.9.5.3 If CenturyLink fails to perform cooperative testing due to CenturyLink's fault, CenturyLink will waive the nonrecurring charge for the installation option. If CLEC still desires cooperative testing, the Parties will attempt to set a new Appointment Time on the same day and, if unable to do so, CenturyLink will issue a jeopardy notice and a FOC with a new Due Date.
Basic Installation With Cooperative Testing. Basic Installation With Cooperative Testing may be ordered for new or existing Unbundled Loops. 9.2.2.9.5.1 For an existing End User Customer, Basic Installation With Cooperative Testing is a "lift and lay" procedure with cooperative testing on the Due Date. The COT "lifts" the Loop from its current termination and "lays" it on a new termination connecting to CLEC. Upon completion of Qwest performance testing, the Qwest Implementor/Tester will contact CLEC, read the Qwest test results, and begin CLEC cooperative testing. Within two (2) business days, Qwest will email the Qwest test results to a single, designated CLEC office email address. CLEC and Qwest will perform a loop back acceptance test, accept the Loop and exchange demarcation information. 9.2.2.9.5.2 For new End User Customer service, Basic Installation With Cooperative Testing may require a dispatch to the End User Customer premises. The COT and Field Technician complete circuit wiring and perform the required performance tests to ensure the new circuit meets the required parameter limits. 9.2.2.9.5.3 If Qwest fails to perform cooperative testing due to Qwest's fault, Qwest will waive the nonrecurring charge for the installation option. If CLEC still desires cooperative testing, the Parties will attempt to set a new Appointment Time on the same day and, if unable to do so, Qwest will issue a jeopardy notice and a FOC with a new Due Date.
Basic Installation With Cooperative Testing. Basic Installation With Cooperative Testing may be ordered for new or existing Unbundled Loops. 2.2.9.5.1 For an existing End User Customer, Basic Installation With Cooperative Testing is a "lift and lay" procedure with cooperative testing on the Due Date. The COT "lifts" the Loop from its current termination and "lays" it on a new termination connecting to NT&T. Within two (2) business days, Windstream will email the Windstream test results to a single, designated NT&T office email address. NT&T and Windstream will perform a loop back acceptance test, accept the Loop and exchange demarcation information. 2.2.9.5.2 For new End User Customer service, Basic Installation With Cooperative Testing may require a dispatch to the End User Customer premises. The COT and Field Technician complete circuit wiring and perform the required performance tests to ensure the new circuit meets the required parameter limits. 2.2.9.5.3 If Windstream fails to perform cooperative testing due to Windstream’s fault, Windstream will waive the nonrecurring charge for the installation option. If NT&T still desires cooperative testing, the Parties will attempt to set a new Appointment Time on the same day and, if unable to do so, Windstream will issue a jeopardy notice and a FOC with a new Due Date.