Basic Installation Sample Clauses

Basic Installation. Basic Installation may be ordered for new or existing Unbundled Loops. Upon completion, Qwest will call CLEC to notify CLEC that the Qwest work has been completed.
AutoNDA by SimpleDocs
Basic Installation. Basic Installation may be ordered for new or existing Unbundled Loops. Upon completion, CenturyLink will call CLEC to notify CLEC that the CenturyLink work has been completed.
Basic Installation. Basic installation includes inside delivery, uncrating, assembly, installation, removal of all debris from premises, installation documents and the xxxx of materials per the purchaser’s approved plan and specifications.
Basic Installation. Basic Installation may be ordered for new or existing Unbundled Loops.
Basic Installation. All flooring installations require foam underlay. Run the foam underlay in the same direction as the laminate panels. Underlay should be butted side by side with no overlap. Tape seams together. Diagram 1. • You will need to remove the tongue on the side of the panels that face the wall. This is to ensure that the decorative surface of the laminate floor is well under the finished trim when installed. Use a utility knife to score through the tongue several times until it easily snaps off. • Start in a corner by placing the first panel with its trimmed side-facing the wall. Use spacers along each wall to maintain an expansion space of 8-12mm (5/16” – 3/8”) between the wall and the flooring. Diagram 2. Remember that this product is primarily wood and needs room to expand and contract. At no point should you attach the floor to any surface. • To attach your second panel, insert the end tongue of the panel into the end groove of the first panel at a 45° angle. Lower the panel flat to the floor. Line edges carefully. Diagram 3. • Continue connecting the first row until you reach the last full panel. Fit the last panel by rotating the panel 180° with the pattern side upward, place beside row, mark and saw off excess. Attached as described above. Diagram 4. • When using a handsaw, cut on the decorative surface. If you use a jig or circular saw, cut with the decorative side down to avoid chipping. Diagram 5. • Begin the next row with the off cut piece from the previous row to stagger the pattern. Pieces should be a minimum of 20cm (8”) long and joint offset should be at least 40cm (16”). Diagram 6. • To start your second row, push the side tongue of the panel into the side groove of the very first panel at about 45°. When lowered, the plank will click into place. Diagram 7. • Attach the second panel of the new row on the long side as described above. Push this panel as close as possible to the previous row. To attach this second panel to the previous panel, tap the end using a tapping block and rubber mallet. Continue alone in the same fashion. Diagram 8/9. • To fit the last row, lay a panel on top of the previous row. With the tongue to the wall, lay another panel upside down on the one to be measured and use it as a ruler. Don’t forget to allow room for spacers. Cut the panel and attach into position. Diagram 10. • Door frames and heating vents also require expansion room. First, cut the panel to the correct length. Then, place the cut panel next to its actual p...
Basic Installation. First Loop $ 11.03 ----------------------------------------------------------------------------------------------------------------------------------- Each Additional Loop $ 6.07 ----------------------------------------------------------------------------------------------------------------------------------- 9.2.4.2 Basic Installation with Performance Testing ----------------------------------------------------------------------------------------------------------------------------------- First Loop $ 17.72 ----------------------------------------------------------------------------------------------------------------------------------- Each Additional Loop $ 8.99 ----------------------------------------------------------------------------------------------------------------------------------- 9.2.4.3 Coordinated Installation with Cooperative Testing ----------------------------------------------------------------------------------------------------------------------------------- First Loop $238.09/1/ ----------------------------------------------------------------------------------------------------------------------------------- Each Additional Loop $197.97/1/ ----------------------------------------------------------------------------------------------------------------------------------- 9.2.4.4 Coordinated Installation without Cooperative Testing ----------------------------------------------------------------------------------------------------------------------------------- First Loop $111.33/1/ ----------------------------------------------------------------------------------------------------------------------------------- Each Additional Analog Loop $ 94.31/1/ -----------------------------------------------------------------------------------------------------------------------------------
Basic Installation. NetApp ASE will connect NetApp-provided Product to existing networks, and configure one initial file service for each NAS protocol and/or logical disk units (“LUNs”) to a maximum of 2 hosts, including NetApp- provided host bus adapters (“HBAs”)/drivers, subject to the limitations stated below. Any Software purchased which runs on Data ONTAP (ie. Snapmirror or Snaplock) will be installed and enabled.
AutoNDA by SimpleDocs
Basic Installation. All Equipment must be installed by a qualified installer. If you are a New Customer, then at the time of your initial installation only you will be entitled to basic installation for each Receiver you rent up to a maximum of four (4); provided however, that if you are renting a dual tuner Receiver, such Receiver shall be considered the equivalent of two (2) single tuner receivers for the purpose of this Section 3. Upon entering into this Agreement, you may also be required to sign an installation work order (“Work Order”) for the installation work to be performed in connection with this Agreement, which may stipulate additional installation charges, if any, for any additional work needed to install the Equipment, which is not covered under the terms of “Professional Basic Installation”. These charges, if any, will be disclosed to you prior to signing the Work Order and entering into this Agreement. You will, at your cost (a) grant ExpressVu and its agents safe access to your premises to install and activate the Equipment, (b) obtain all permits, consents and approvals for the installation, and (c) pay any installation fees disclosed to you prior to entering into this Agreement, if applicable. See information packaged with your Agreement for more information and a description of what is included in “Professional Basic Installation” and “Additional Receiver Installation”.
Basic Installation. Basic Installation may be ordered for new or existing Unbundled Loops. Upon completion, ALLTEL will provide a completion notice to Qwest to notify Qwest that the ALLTEL work has been completed.
Basic Installation. Basic Installation may be ordered for new or existing Unbundled Loops. Upon completion, Windstream will notify NT&T that the Windstream work has been completed.
Time is Money Join Law Insider Premium to draft better contracts faster.