Backups and Recovery Point Objective (RPO Sample Clauses

Backups and Recovery Point Objective (RPO. RPO is our goal for the maximum amount of data CartoVista can tolerate losing, measured in time (hours). Since CartoVista backups are daily, the RPO is 24 hours.
AutoNDA by SimpleDocs

Related to Backups and Recovery Point Objective (RPO

  • Interconnection Customer Compensation for Actions During Emergency Condition The CAISO shall compensate the Interconnection Customer in accordance with the CAISO Tariff for its provision of real and reactive power and other Emergency Condition services that the Interconnection Customer provides to support the CAISO Controlled Grid during an Emergency Condition in accordance with Article 11.6.

  • Program Objectives Implement a rigorous constructability program following The University of Texas System, Office of Facilities Planning and Construction Constructability Manual. Identify and document project cost and schedule savings (targeted costs are 5% of construction costs). Clarification of project goals, objectives.

  • Goals & Objectives 1. The goal of this Agreement is (INSERT GOAL(S) OF AGREEMENT).

  • Agreement Objectives The parties agree that the objectives of the Agreement are to facilitate:

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall operate within a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA in order to maintain a specified voltage schedule, if the Interconnection System Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standard can be met by using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two, if agreed to by the Participating TO and CAISO. The Interconnection Customer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the Interconnection System Impact Study shows this to be required for system safety or reliability.

  • Project Objectives The Program consists of the projects described in Annex I (each a “Project” and collectively, the “Projects”). The objective of each of the Projects (each a “Project Objective” and collectively, the “Project Objectives”) is to:

  • Project Objective A description of the overall purpose and expected outputs and outcomes or results of the Loan Agreement, including significant deliverables and, if appropriate, units of measure.

  • PERFORMANCE OBJECTIVES 4.1 The Performance Plan (Annexure A) sets out-

  • Contract Goals A. For purposes of this procurement, OGS conducted a comprehensive search and determined that the Contract does not offer sufficient opportunities to set goals for participation by MWBEs as subcontractors, service providers, or suppliers to Contractor. Contractor is, however, encouraged to make every good faith effort to promote and assist the participation of MWBEs on this Contract for the provision of services and materials. The directory of New York State Certified MWBEs can be viewed at: xxxxx://xx.xxxxxxxxxxxxxx.xxx/FrontEnd/VendorSearchPublic.asp?TN=ny&XID=2528. Additionally, following Contract execution, Contractor is encouraged to contact the Division of Minority and Women’s Business Development ((000) 000-0000; (000) 000-0000; or (000) 000-0000) to discuss additional methods of maximizing participation by MWBEs on the Contract.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

Time is Money Join Law Insider Premium to draft better contracts faster.