Protocol The attached Protocol shall be an integral part of this Agreement.
Signaling protocol 4.1.3.1 SS7 Signaling is AT&T-21STATE’s preferred method for signaling. Where MF signaling is currently used, the Parties agree to use their best efforts to convert to SS7. If SS7 services are provided by AT&T-21STATE, they will be provided in accordance with the provisions of the applicable access tariffs. 4.1.3.2 Where MF signaling is currently used, the Parties agree to interconnect their networks using MF or dual tone MF (DTMF) signaling, subject to availability at the End Office Switch or Tandem Switch at which Interconnection occurs. The Parties acknowledge that the use of MF signaling may not be optimal. AT&T-21STATE will not be responsible for correcting any undesirable characteristics, service problems or performance problems that are associated with MF/SS7 inter-working or the signaling protocol required for Interconnection with CLEC employing MF signaling.
Data Acquisition The acquisition of data to realistically simulate the electrical behavior of system components is a fundamental requirement for the development of a reliable interconnected transmission system. Therefore, the TSP and the Generator shall be required to submit specific information regarding the electrical characteristics of their respective facilities to each other as described below in accordance with ERCOT Requirements.
Construction Change Directives 1.1.1, 3.4.2, 3.11, 3.12.8, 4.2.8, 7.1.1, 7.1.2, 7.1.3, 7.3, 9.3.1.1 Construction Schedules, Contractor’s 3.10, 3.11, 3.12.1, 3.12.2, 6.1.3, 15.1.6.2
Review Protocol A narrative description of how the Claims Review was conducted and what was evaluated.