60% Design Documents Clause Samples

The "60% Design Documents" clause defines the requirement for the contractor or design professional to submit design documents that are approximately 60% complete at a specified stage of the project. These documents typically include preliminary drawings, specifications, and other materials that demonstrate the project's progress and allow for review and feedback before finalizing the design. By establishing this milestone, the clause ensures that stakeholders can assess the design's direction, identify potential issues early, and make necessary adjustments, thereby reducing the risk of costly changes or delays later in the project.
POPULAR SAMPLE Copied 1 times
60% Design Documents. The 60% design deliverables are based on the details established during the preliminary design task. Following is a list of activities anticipated during this task:  Incorporate the Town’s preliminary design review comments and proceed with detailed design drawings.  Prepare first draft of technical specifications.  Prepare preliminary decommissioning and demolition plans.  Prepare preliminary sequencing plan for of major electrical and process interconnections  Perform constructability review.  Hold internal coordination workshop between disciplines.  Update preliminary opinion of probable construction cost (OPCC) based on the 60% design documents.  Review work products and obtain quality control reviewer approvals.  Submit 60% complete design documents to the Town for review and comment (PDF copy and two half-sized sets).  Facilitate a design review workshop to receive Town review comments.
60% Design Documents. ▇▇▇▇▇▇ will prepare a complete set of 60% design plans and cost estimate for both Village Greens Circle and Edgewater Lane Projects. Design plans will address the following design elements: ▇▇▇▇▇▇ will review the benefits and limitations of available trenchless rehabilitation methods to ensure a good fit and that the final product meets the needs of the City. A total of 2,040 LF of sanitary sewer pipe, 3,660 LF of storm sewer pipe, 23 sanitary sewer laterals, 34 storm sewer laterals, 10 sanitary sewer structures, and 51 storm sewer structures will be assessed for rehabilitation or replacement.