CONNECTIVITY नमुना कलम
CONNECTIVITY. The maximum capacity for interconnection with the grid at a specific voltage level shall be as specified in the Distribution Code/Supply Code of the State and amended from time to time. Following criteria have been suggested for selection of voltage level in the distribution system for ready reference of the solar suppliers. Up to 10 kW 240V-single phase or 415V-three phase at the option of the consumer Above 10kW and up to 100 kW 415V – three phase Above 100kW At HT/EHT level (11kV/33kV/66kV) as per DISCOM rules Utilities may have voltage levels other than above, DISCOMS may be consulted before finalization of the voltage level and specification be made accordingly. Testing, Certification and Approval Schedule All components, sub -assemblies and system test parameters shall be verified on site to ensure they meet the specifications. The overall energy performance ratio of the system shall exceed 75%. (Sum total of the system energy losses shall not exceed 25%). For global solar insolation in the Plane of Array (PoA) of 5 kWh/ m2 (5 Peak Sun Hours) for the day. For example: 10kW PV power plant AC energy output shall be minimum of 37.5 kWh (10 kW x 0.75 x 5 hrs.) for the day.
