Zone lot definition

Zone lot means a parcel of land in single ownership that is large enough to meet the minimum zoning requirements of its zoning district and can provide such yards and other open spaces that are required by the site development regulations.
Zone lot means a parcel of land in single ownership that is of sufficient size to meet minimum zoning requirements for area, coverage and use, and that can provide such yards and other open spaces as required by the Zoning Code.

Examples of Zone lot in a sentence

  • The following Table 9.3630 sets forth S-JW Jefferson Westside Special Area Zone lot standards, subject to the special standards in EC 9.3631.

  • A copy of our Liability Insurance and Workmen’s Compensation will be forthcoming upon being awarded bid.

  • Except for properties zoned R-1A, R-1B or R-2, within the Parking Impact Zone lot density shall be controlled by building height allowed within the Parking Impact Zone, required number of off street parking spaces and required yards within the underlying zoning district.

  • The proposed Zone Change to a RD5 Zone from a R1 Zone, if approved, would not conflict with any land use policy, as the request contemplates a zone that is within the range of density that would be permitted by subdivision under the existing R1 Zone lot area requirements.

  • Likewise, ROU agrees to grant a credit for the VAT on the construction cost of the fly-over route that provides access to the New Free Trade Zone lot and in the improvement works to the sidewalk that are deemed necessary for such zone’s feasibility, performed on national or departmental real estate property.

  • For example: The required minimum side interior setback for an Urban House building form in an U-SU zone district varies depending on the Zone lot width.

  • Zone lot amendments have been processed and Development Services has released the applicant from Concept Review, giving the applicant permission to proceed with a Formal Site Development Plan.However, a Site Development Plan will not be approved for zoning review until the rezoning process has been completed.

  • Outlot A, as defined by Section 24-101(b)(9) of the Subdivision Regulations will not be a legal building site.In the L-D-O Overlay Zone lot sizes are guided by the underlying zoning.

  • The district court rejected Hillcrest's contention that BMC had assigned its interest in the Contract to Hillcrest prior to BMC's dissolution in 1993, concluded that a purported 2005 assignment from BMC to Hillcrest was not valid due to BMC's long-standing dissolution, and concluded that Hillcrest did not enjoy third- party beneficiary status as to the flood control fee waiver because that portion of the Contract was intended to benefit only BMC and the RP Zone lot owners pursuant to Paragraph 12.

  • These heating cable circuits can be assembled and installed in the field using the appropriate connection kits.

Related to Zone lot

  • Floodplain or flood-prone area means any land area susceptible to being inundated by water from any source. See "Flood or flooding."

  • Zone 3 means all of that part of the Lower Peninsula south of the line described in subdivision (bb).

  • Zone 2 means British Columbia and Alberta Receipt Points and Liquids Receipt Points at or upstream of the Blueberry Hill Compressor Station. ARTICLE 2 QUALITY‌ 2.1 Subject to Articles 2.4, 2.5, 2.6, 2.7 and 21.1 hereof, Gas tendered to Transporter at Receipt Points shall conform to the following Quality Specifications:‌

  • Zone 1 means Alberta Receipt Points and Liquids Receipt Points downstream of the Blueberry Hill Compressor Station.

  • Area of special flood hazard means the land in the floodplain within a community subject to a one percent or greater chance of flooding in any given year.

  • Harvest lot means a specifically identified quantity of marijuana that is, cultivated utilizing the same growing practices and harvested within a 72 hour period at the same location and cured under uniform conditions.

  • Water Surface Elevation (WSE means the height, in relation to mean sea level, of floods of various magnitudes and frequencies in the floodplains of coastal or riverine areas.

  • Water surface elevation means the height, in relation to the National Geodetic Vertical Datum (NGVD) of 1929, the North American Vertical Datum (NAVD) of 1988, or other datum, where specified, of floods of various magnitudes and frequencies in the floodplains of riverine areas.

  • Excavation zone means the volume containing the tank system and backfill material bounded by the ground surface, walls, and floor of the pit and trenches into which the UST system is placed at the time of installation.

  • Flood Hazard Boundary Map (FHBM means an official map of a community, issued by the Federal Emergency Management Agency, where the boundaries of the Special Flood Hazard Areas have been defined as Zone A.

  • Single-family dwelling unit means a structure that is usually occupied by just one household or family and for the purposes of this Policy is expected to generate an average of 250 gallons per day of wastewater.

  • Through lot means a lot having frontage on two parallel streets or a lot that is not a corner lot that has frontage on two streets, each of which may provide access to the lot.

  • Floodplain Development Permit means any type of permit that is required in conformance with the provisions of this ordinance, prior to the commencement of any development activity.

  • Manufactured dwelling park means a place where four or more manufactured dwellings

  • Contaminate means the addition of sediment, any other pollutant or waste, or any illicit or prohibited discharge.

  • Flood Elevation Study means an examination, evaluation and determination of flood hazards and, if appropriate, corresponding water surface elevations, or an examination, evaluation and determination of mudslide (i.e., mudflow) or flood-related erosion hazards.

  • Corner Lot means a Lot situated at the intersection of and abutting upon two Streets, or upon two parts of the same Street, the adjacent sides of which Street or Streets, (or, in the case of a curved corner, the tangents at the Street extremities of the Side Lot Lines) contain an angle of not more than 135 degrees. In the case of a curved corner, the corner of the Building Lot shall be that point on the Lot Line abutting a Street nearest to the point of intersection of the said tangents.

  • Non-Retail Behind The Meter Generation means Behind the Meter Generation that is used by municipal electric systems, electric cooperatives, or electric distribution companies to serve load.

  • Impact surface means an interior or exterior surface that is subject to damage by repeated sudden force such as certain parts of door frames.

  • Flood Boundary and Floodway Map (FBFM means an official map of a community, issued by the FEMA, on which the Special Flood Hazard Areas and the floodways are delineated. This official map is a supplement to and shall be used in conjunction with the Flood Insurance Rate Map (FIRM).

  • Area of shallow flooding means a designated AO or AH Zone on a community's Flood Insurance Rate Map (FIRM) with one percent or greater annual chance of flooding to an average depth of one to three feet where a clearly defined channel does not exist, where the path of flooding is unpredictable and indeterminate; and where velocity flow may be evident. Such flooding is characterized by ponding or sheet flow.

  • Parking Lot means a building or land used for the parking or storage of ten or more motorcars or bakkies, or two or more buses or trucks, excluding −

  • Underground storage means storage of gas in a subsurface stratum or formation of the earth.

  • Regulated impervious surface means any of the following, alone or in combination:

  • Floodway means the channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than a designated height.

  • Underground storage tank or “UST” means any one or combination of tanks (including underground pipes connected thereto) that is used to contain an accumulation of regulated substances, and the volume of which (including the volume of underground pipes connected thereto) is 10 percent or more beneath the surface of the ground. This term does not include any: