The ▇▇▇▇▇▇ Substation WP-1 and WP-2 tap configurations will be each be converted to breaker and a half configuration.
The new 2300 bay will include two new 230kV circuit breakers, SF6 type, 2000A continuous circuit, rated 900kV, 63 kA circuit breakers, associated disconnect switches, and line terminal equipment to accommodate the relocated WP-1 transmission line.
Plattsburgh Substation The Plattsburgh Substation WP-1 and WP-2 lines will be re-designated DP-1 and RYP-2 respectively.
The new 2300 bay will include two new 230kV circuit breakers, SF6 type, 2000A continuous circuit, rated 900 kV, 63 kA circuit breakers, associated disconnect switches, and line terminal equipment to accommodate the relocated WP-1 transmission line.
These measures are without prejudice to driver behaviour rules on how to use these systems in the Contracting Parties as currently being discussed by the Global Forum for Road Traffic Safety (WP.1) at the time of drafting this document (See e.g. Informal Document 4 Revision 1 of the seventy-eight session of WP.1).
The Plattsburgh Substation WP-1 and WP-2 lines will be re-designated DP-1 and RYP-2 respectively.
Plattsburgh Substation The Plattsburgh Substation WP-1 and WP-2 lines will be re-designated DP-1 and RYP-2 respectively.
The full scope includes the installation of a third two-breaker bay and disconnect switches at the ▇▇▇▇▇▇ Substation, the 2300 bay (to accommodate a realignment of the tie-in point for the WP-1 ▇▇▇▇▇▇ to Plattsburgh transmission line) and the addition of a breaker to the 2100 bay for the WP-2 line, all to allow for the lines to be better able to respond to certain contingent operating conditions and faults on the system.
Drawing on the sustainability and impact reports from WP1, as well as the final deliverables from each of the work packages, WP4 will also produce an overall guide to dissemination for EU projects, based on the extensive experience gained and lessons learnt during both the GridTalk and e-ScienceTalk projects for wider dissemination to EC-funded projects and beyond.
Design effort for high quality promotional materials will be provided by APO, with essential additional content writing input from the Science Writer and Dissemination Officer at CERN and the WP1 team at QMUL.