working load limit definition

working load limit means the maximum load that may be applied to a component of a cargo securement system during normal service determined in accordance with Divisions 3 and 4 of Part 1.
working load limit means the working load that must not be exceeded for a particular application as established by a regulatory or standards-setting agency.
working load limit means the maximum load limit, measured in pounds, of a tiedown, established by the manufac- turer of a chain, cable, webbing strap, or end device.

More Definitions of working load limit

working load limit means the maximum weight or load, as established by the manufacturer of the equipment, that equipment can bear under normal operating conditions.
working load limit or “WLL” means a load that is one-third the breaking strength of a tie-down component or assembly. For instance, if the breaking strength of a tie-down component or assembly is 6 800 kg (15 000 lb.), its working load limit would be 2 268 kg
working load limit or "WLL" means the maximum load which a product is authorized by the manufacturer to support in a particular service.

Related to working load limit

  • Normal Maximum Generation means the highest output level of a generating resource under normal operating conditions.

  • Maximum Facility Output means the maximum (not nominal) net electrical power output in megawatts, specified in the Interconnection Service Agreement, after supply of any parasitic or host facility loads, that a Generation Interconnection Customer’s Customer Facility is expected to produce, provided that the specified Maximum Facility Output shall not exceed the output of the proposed Customer Facility that Transmission Provider utilized in the System Impact Study.

  • Normal Minimum Generation means the lowest output level of a generating resource under normal operating conditions.

  • Maximum Term Loan Amount means Forty Million and No/100 Dollars ($40,000,000).

  • Facility Production Limit means the production limit placed on the main product(s) or raw materials used by the Facility that represents the design capacity of the Facility and assists in the definition of the operations approved by the Director.