WCEH definition
Examples of WCEH in a sentence
There are no schemes in operation entitling an employee of WCEH to a commission or remuneration calculated by reference to the whole or part of the turnover, profits or sales of WCEH.
Where provision for deferred taxation is not made in the Last Accounts, details of the amounts of deferred taxation are disclosed in the WCEH Disclosure Letter.
During the period of installation and ongoing operation (an estimated 18 – 24 months for installation plus 5 years of ongoing operation, maintenance and repair following commissioning of all WCEH stations), Contractor shall provide complete maintenance and operation services for both DCFC and Level 2 EVSE charging equipment.
There is no amount owing by WCEH to a creditor other than in the ordinary course of business which has been due for more than 3 months.
WCEH has obtained all necessary licences and consents for the proper carrying on of its business and all material licences and consents are valid and subsisting and so far as the Vendor is aware WCEH is not in breach of any of such licences or consents.
In the case of new charging station sites and as required for current WCEH sites, after all land use and building permits have been obtained, Contractor shall make all site preparations in advance of construction activities.
Within 6 months after installation of all WCEH charging locations, Contractor shall hold 3 geographically dispersed meetings at locations such that at least one of the meetings is within a reasonable driving distance from each of the Host Sites, and at least one virtual session, to allow Host Site staff from multiple charging station locations to attend the same training session, if Contractor prefers a consolidated training regimen.
If Contractor does not own current WCEH charging stations, then new DCFC and Level 2 charging equipment that meets updated requirements must be installed at new host site locations and Contractor shall not be responsible for any actions regarding the pre-existing WCEH charging stations.
Installation of DC Fast-Chargers, Level 2 EVSE and associated structures and site improvements at all Oregon WCEH existing and new locations.
WCEH does not use a name for any purpose other than its full corporate name.