WBM definition
Examples of WBM in a sentence
Base and Sub-base Course Interlocking Paver block should be placed above properly compacted Base and Sub-base, according to the site type of roads, for medium traffic roads, 150mm thick GSB and 100mm thick WBM is minimum requirement.
Excavation shall include the removal of WBM roadway surfaces, brick surfacing, including dressing, compaction of the bottoms of the excavation, shoring and strutting wherever required, dewatering whenever required, removal of the excavated soil, stockpiling and disposal of surplus excavated soil off-site as directed by the Employer's Representative.
This work shall consist of providing clean and crushed aggregates, laying & compacting of WBM sub-base / base course by rolling and bonding together with screening, binding material where necessary and watering, including preparation and compaction of sub-base & spreading of crushed aggregate to proper grade and camber including application of screenings for interlocking, sprinkling of water & rolling with power roller as per instructions of the Employer‟s Representative, shall be as specified below.
For the WBM the flight deck copy is an advance copy only of the customized manual, not subject to revision or updating.
Manual (WBM) and Weight and Balance Manual Supplements--C The corresponding supplements: -Delivery Weighing Report, -Equipment List, will be delivered with each Aircraft.
This work shall consist of providing clean and crushed aggregates, laying & compacting of WBM sub-base / base course by rolling and bonding together with screening, binding material where necessary and watering, including preparation and compaction of sub-base & spreading of crushed aggregate to proper grade and camber including application of screenings for interlocking, sprinkling of water & rolling with power roller as per instructions of the Employer’s Representative, shall be as specified below.
Existing Road Surface Proposed Road Surface Bituminous or Asphalt Same as Existing Concrete Bituminous or Concrete (as per direction of Employer’s Representative) Water Bound Macadam (WBM) Same as Existing Brick Same as Existing or Bituminous (as per direction of the Employer’s Representative) Earthen Same as Existing The work shall be carried as per the Road Work Specifications (latest) of the Public Works Department (PWD), Government of Assam.
The Contractor shall be responsible to ensure that all existing asphalt roads, brick roads, concrete roads, WBM roads are reinstated as stated in Road Subsection, immediately after hydraulic testing of the pipeline and backfilling has been completed.
As consideration for the license on the CBD Software, PlanetCAD will provide maintenance on the WBM Software at no cost to Dassault Systemes.
WBM is authorized to pass such warranties through to its customers and WBM’s customers are authorized to pass them through to customers and users of such products.