Waste Areas definition
Examples of Waste Areas in a sentence
The Contractor shall leave that part of the Site and the Works in a clean and safe condition and shall make good any Borrow Pits or Waste Areas located on such part of the Site.
The Site and Borrow Pits, Quarries and Waste Areas shall be made available to the Contractor: - free of charge with no demolition required; - free of any rights in the Site that could impede or interfere with the performance of the Works; - with free access in accordance with Sub-Clause 4.15; - free of any hindrance from any existing Utilities; - having been first cleared of any Hazardous Wastes or Materials by a specialist contractor.
The Employer shall make Borrow Pits, Quarries and Waste Areas exclusively available to the Contractor on land owned by the Government of Kosovo, only for purpose of the execution of the Works in accordance with the Contract, within two months from the date on which the Contractor has first been granted access to, and possession of, the Site.
Examination/Hazardous Waste Areas: Within the storage lot there must be two designated areas that are paved and sealed adequately to prevent runoff and/or percolation of liquid waste, on which to inspect and store vehicles leaking fluids.
Prior to initiation of the construction activities, EPA will have a qualified professional perform a site reconnaissance of the Upper and Lower Waste Areas and the ▇▇▇ ▇▇▇▇▇ Tributaries to determine if any additional features have been exposed or identified since the original recording on the previous GIS maps.
T‐5000 0+00 to 52+70 105 Seed T‐5001 0+00 to 3+95 12 Seed T‐5003 0+00 to 3+20 10 Seed T‐5004 0+00 to 1+75 5 Seed T‐5200 0+00 to 17+70 35 Seed Waste Areas 20 Seed *Quantities are estimates only.
AR shall perform all reclamation and other Response Actions which may be required pursuant to the ROD for the Mine Waste Source Areas known as the Anaconda Sampling Works, the ▇▇▇▇▇ Tailings Waste Areas, the Gold ▇▇▇▇▇ Dumps, the ▇▇▇▇▇ ▇▇▇▇, the Unnamed Dump Site and the Colorado Smelter.
The Parties anticipate that the Consent Decree will require reclamation of the Mine Waste Source Areas known as the Anaconda Sampling Works, the ▇▇▇▇▇ Tailings Waste Areas, the Gold ▇▇▇▇▇ Dumps, the ▇▇▇▇▇ ▇▇▇▇, and the Unnamed Dump Site consistent with the standards and specifications for land reclamation in the BPSOU.