Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.
MSAA Indicator Technical Specifications document means, as the context requires, either or both of the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Indicator Technical Specifications November 5, 2018 Version 1.3” and the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Target and Corridor-Setting Guidelines” as they may be amended or replaced from time to time;
Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.
Phase I Clinical Study means a human clinical study of a product, the principal purpose of which is a preliminary determination of safety in healthy individuals or patients, as described in 21 C.F.R. 312.21(a).
S&P CDO Monitor Test A test that will be satisfied on any date of determination (following receipt, at any time on or after the S&P CDO Monitor Election Date, by the Issuer and the Collateral Administrator of the Class Break-even Default Rates for each S&P CDO Monitor input file (in accordance with the definition of “Class Break-even Default Rate”)) if, after giving effect to a proposed sale or purchase of an additional Collateral Obligation, the Class Default Differential of the Highest Ranking Class of the Proposed Portfolio is positive. The S&P CDO Monitor Test will be considered to be improved if the Class Default Differential of the Proposed Portfolio that is not positive is greater than the corresponding Class Default Differential of the Current Portfolio.