Utility Potholing definition

Utility Potholing means boring a hole with high pressure water and vacuum suction to locate underground utilities.
Utility Potholing. ▇▇▇▇ has researched the City’s utility plans and has identified at least 44 utility crossings that will be required for this project (provided on Figure X). To allow for potholing of additional utility crossings that are discovered during the review of existing data, we have budgeted for 50 utility potholes. ▇▇▇▇ will subcontract utility potholing services to Badger Daylighting out of Cheyenne, WY. • Surveying – A topographic survey will be conducted along the street construction alignment and the selected storm sewer alignment. The survey will include existing invert elevations of manholes that could be potential tie-in locations, visible utilities and utility markings, existing structures in the ROW, and other pertinent data. The survey will be conducted following the completion of utility potholing and geotechnical borings, so that the locations of these investigations can be included in the survey. The survey will be overseen by a Professional Land Surveyor (PLS) from ▇▇▇▇’▇ Sheridan, WY office, ▇▇▇▇ ▇▇▇▇▇▇▇▇. ▇▇▇▇ has created a preliminary storm sewer alignment that appears feasible to construct (Figure 1) and would meet the project objectives. However, it is possible that existing grade constraints, difficulty of easement acquisition, utility conflicts, or other factors could require alternate routes to be explored. ▇▇▇▇ will work with the City to define alternate alignments and will prepare conceptual layouts for each

Examples of Utility Potholing in a sentence

  • As built information for newly constructed facilities within the project limits • Design drawings for proposed improvements adjacent to the project • As-built documents from Phase 1 construction • Updated City GIS data • Updated information on existing City utilities • Utility Potholing • Luminaire & signal pole spread footing foundation detail The project duration through construction is estimated at 18 months.

  • Incorporated, doing business as VacX, to provide its Utility Potholing services; and Willamette Cultural Resources Associates, Ltd.

  • Utility Coordination, ▇▇▇▇▇ ▇▇▇▇▇▇▇ Permitting, ▇▇▇▇▇ ▇▇▇▇ Environmental Review, ▇▇▇▇▇ ▇▇▇▇ QA/QC Review, ▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇, P.E. ▇▇▇▇▇▇ Associates, Geotechnical Engineering ▇▇ ▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇, 3rd Floor San Francisco, CA 94105 Exaro Technologies Corporation, Utility Potholing ▇▇▇▇ ▇▇▇ ▇▇▇▇▇▇▇▇ ▇▇▇.

  • The authorized total Not-to-Exceed fee for Task Order No. 50 and Amendment No. 01 increased to $1,009,763.00; and Whereas, Amendment No. 02 to Task Order No. 50 in the amount of $99,568.00 was executed on April 23, 20 18 to provide Additional Geotechnical Evaluation, Utility Potholing and Design Modifications .

  • The following are the sub-consultants on this project: ▇▇▇▇▇▇ Associates, Geotechnical Engineering ▇▇ ▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇, 3rd Floor San Francisco, CA 94105 Project Manager: ▇▇▇▇▇▇ ▇▇▇▇ Exaro Technologies Corporation, Utility Potholing ▇▇▇▇ ▇▇▇ ▇▇▇▇▇▇▇▇ ▇▇▇.

  • Utility Investigations Utility Potholing (AirX) $37,816 60% Submittal Total $438,159 III.

  • Private Utility Potholing – CONSULTANT will provide utility owners the proposed improvements and identify potential utility conflict after approval of the 30% design and project footprint and request utility owners to pothole those locations.