User Acceptance Test (UAT definition

User Acceptance Test (UAT means the User Acceptance Testing of the ordered product and services on completion of installation and commissioning as per the requirement.
User Acceptance Test (UAT means the acceptance testing of the network links commissioned as per the requirement.
User Acceptance Test (UAT means user acceptance test of the new network/connectivity/infrastructure setup.

Examples of User Acceptance Test (UAT in a sentence

  • Ensure the language in this section does not conflict with the VITA Contract language.)Acceptance Criteria for this Solution will be based on a User Acceptance Test (UAT) designed by Supplier and accepted by the Authorized User.

  • On satisfactory completion of the aforementioned tests, the User Acceptance Test (UAT) letter will be issued to Service Provider by the competent authority on the line of Appendix-I.

  • Ensure the language in this section does not conflict with the VITA Contract language.) Acceptance Criteria for this Solution will be based on a User Acceptance Test (UAT) designed by Supplier and accepted by the Authorized User.

  • The installation reports/ User Acceptance Test (UAT) Certificate should be in format duly vetted and checked by the bank officials as per requirements.

  • On satisfactory completion of the aforementioned tests, the User Acceptance Test (UAT) letter will be issued to the vendor by the competent authority on the line of Annexure-I.

  • The Acceptance criteria for the any part or all of the Solution for Bank environment is subject to Installation reports and User Acceptance Test (UAT) Certificate signed by the Bank/ Branch officials for installed solution after its successful commissioning and with satisfactory access of all the applications, as required.

  • Software Development Life Cycle (SDLC) with User Acceptance Test (UAT) shall be followed and conducted in the development and implementation stage.

  • Installation reports and User Acceptance Test (UAT) Certificate shall be duly signed by Bank/ Branch officials and the bidder’s engineer for installed endpoints with satisfactory access of all the applications, as required.

  • Acceptance Criteria Acceptance Criteria for this Solution will be based on a User Acceptance Test (UAT) designed by Supplier and accepted by the Authorized User.

  • Installation reports and User Acceptance Test (UAT) Certificate shall be duly signed by Bank officials and the Bidder’s engineer for installed components with satisfactory access of all the applications required.


More Definitions of User Acceptance Test (UAT

User Acceptance Test (UAT means the User Acceptance Testing of the ordered product
User Acceptance Test (UAT means the System Test conducted by Users, as specified in Subtask 2.3 – Develop UAT Plan and Conduct UAT.
User Acceptance Test (UAT means the process to obtain confirmation by an approved SME from the agency that the system meets mutually agreed-upon requirements.
User Acceptance Test (UAT means a set of tests, milestones and criteria mutually agreed between both Parties for the purpose of qualifying the fitness, performance and readiness for production of an intended Service (or any enhancements, upgrades, amendments and changes thereto);

Related to User Acceptance Test (UAT

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.

  • Acceptance Test Document means a document, which defines procedures for testing the functioning of installed system. The document will be finalized with the contractor within 7 days of issuance of the Letter of Award.

  • Operational Acceptance means the acceptance by the Procuring Entity of the Facilities (or any part of the Facilities where the Contract provides for acceptance of the Facilities in parts), which certifies the Contractor's fulfillment of the Contract in respect of Functional Guarantees of the Facilities (or the relevant part thereof) in accordance with the provisions of GCC Clause 28 (Functional Guarantees) hereof and shall include deemed acceptance in accordance with GCC Clause 25 (Commissioning and Operational Acceptance) hereof.

  • MSAA Indicator Technical Specifications document means, as the context requires, either or both of the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Indicator Technical Specifications November 5, 2018 Version 1.3” and the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Target and Corridor-Setting Guidelines” as they may be amended or replaced from time to time;

  • Backflow prevention device means a safety device used to prevent pollution or contamination of the water supply due to the reverse flow of water from the irrigation system.

  • DNS test Means one non-­‐recursive DNS query sent to a particular “IP address” (via UDP or TCP). If DNSSEC is offered in the queried DNS zone, for a query to be considered answered, the signatures must be positively verified against a corresponding DS record published in the parent zone or, if the parent is not signed, against a statically configured Trust Anchor. The answer to the query must contain the corresponding information from the Registry System, otherwise the query will be considered unanswered. A query with a “DNS resolution RTT” 5 times higher than the corresponding SLR, will be considered unanswered. The possible results to a DNS test are: a number in milliseconds corresponding to the “DNS resolution RTT” or, undefined/unanswered.

  • Network Interface Device or "NID" is a Network Element (including all of its features, functions and capabilities) that includes any means of Interconnection of End User Customer premises wiring to Qwest's distribution plant, such as a cross connect device used for that purpose. "New Service Provider" means the Party to which an End User Customer switches its local Exchange Service or the Party to which an End User Customer is porting its telephone number(s).

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.