Units Under Construction definition

Units Under Construction means Units where on-site construction has commenced as evidenced by the trenching of foundations for such Units, other than Units Under Contract.
Units Under Construction means Units for which building permits have been issued where on-site construction has commenced on a Finished Lot as evidenced by the trenching of foundations for such Units.
Units Under Construction means any Units as to which any on-site, above-ground (E.G., framing) construction has commenced.

Examples of Units Under Construction in a sentence

  • The Department will annually compare the proportional cost increases from October of the prior year to October of the year being calculated based on the Construction Price Index for Multifamily Housing Units Under Construction (US Census Bureau) and increase the square foot cost targets in this item by that annual proportional amount of increase.

  • Units Under Construction - Units for which ground has been broken and construction is underway but not completed.

  • This equates to 42% of all units under construction within the Dublin Region being located within DLRFCC, 26%DCC, 24%No of Units Under Construction DLR, 42% SDCC, 8%FCC, 39%DCC, 19%Active Sites in Dublin - Q1 2016 DLR, 30% SDCC, 12%Fig 4 – Comparative Analysis Active Sites Fig 5 – Comparative Analysis – No of units under construction In terms of housing completions, 651 units were completed in DLR in 2015 which represents 22% of the 2,981 completions within the Dublin Metropolitan Area.

  • Figure 14Nuclear Generating Capacity: 2012-2030(Existing Units, Unit Retirements, Planned Uprates, and Units Under Construction in 2014Source: EIA, AEO 2014ER.

  • Trammell Crowe’s Alexan at Overlook - Multifamily, 300 Units, Under Construction, 2015 - 29.

  • Pulte Homes’ Vinings Crest - Townhomes, 63 Units, Under Construction, 2015 - 26.

  • In 2003 there were no new entries but only previously accepted cases.

  • John Wieland Homes’ Gates at Ivy Walk - Townhomes, 24 Units, Under Construction, 2015 - 18.

  • Oxford Properties’ Encore - Multifamily, 327 Units, Under Construction, 2015 - 22.

  • See Nuclear Units Under Construction Worldwide, NUCLEAR ENERGY INST., http://www.nei.org/Knowledge- Center/Nuclear-Statistics/World-Statistics/Nuclear-Units-Under-Construction-Worldwide (last updated Mar.


More Definitions of Units Under Construction

Units Under Construction those Units (one Weaned Pig Unit in Yuma County, Colorado and one Weaned Pig Unit in Wayne County, Illinois) as to which Borrower, as of the Closing Daxx, xs entitled to further disbursements under the Existing Term Loan and the Existing Revolving Loan.
Units Under Construction. The real property description for each Unit Under Construction is set forth on Exhibit 8.17 hereto. All construction performed on or before the date of this Agreement with respect to construction of each Unit Under Construction has been performed within the boundaries of that portion of Borrower's Real Property on which such Unit Under Construction is being constructed ("UNIT UNDER CONSTRUCTION PREMISES"). Such construction has been fully paid for, to the extent due, and no lien for labor, material or supplies has been asserted, or threatened, against any Unit Under Construction or any Unit Under Construction Premises, except for liens constituting a Permitted Encumbrance and liens that have been released. To the knowledge of Borrower after due inquiry, there is no structural defect in the construction of any Unit Under Construction. To the knowledge of Borrower after due inquiry, no material violation of the laws, regulations, or requirements of any governmental authority exists with respect to the construction of any Unit Under Construction. The anticipated use of each Unit Under Construction complies, in all material respects, with applicable zoning ordinances, regulations and restrictive covenants affecting the Unit Under Construction Premises.

Related to Units Under Construction

  • Completion of Construction means all the construction is complete except for minor weather-related components and conforms to the approved plans and specifications and change orders.

  • Existing construction means any structure for which the "start of construction" commenced before the effective date of the initial floodplain management code or ordinance adopted by the community as a basis for that community's participation in the NFIP.

  • New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.

  • Original construction ’ shall mean the first or initial construction

  • Cost of Construction means the total cost to Owner of those portions of the entire Project designed or specified by the Design Professional. Cost of Construction does not include the Design Professional's compensation and expenses and Owner's expenses associated with the Project or the cost of other services to be provided by others to the Owner.

  • Contribution in aid of construction, as used in this subrule, means a nonrefundable cash payment grossed-up for the income tax effect of such revenue covering the costs of a distribution main extension or service line that are in excess of costs paid by the utility. The amount of tax shall be reduced by the present value of the tax benefits to be obtained by depreciating the property in determining the tax liability.

  • Commenced Construction means (a) all of the following site preparation work is completed: ingress and egress routes exist; the site on which the project will be located is cleared and graded; there is power service to the site; footings are prepared; and foundations have been poured consistent with purchased equipment specifications and project design; or (b) the following financial commitments have been made: (i) (A) an engineering, procurement, and construction contract (“EPC”) has been executed by all parties and is effective; or (B) contracts (collectively, “EPC Equivalents”) for all of the following have been executed by all parties and is effective: (1) project engineering, (2) procurement of all major equipment, and (3) construction of the project, and (ii) the cumulative payments made by the developer under the EPC or EPC Equivalents to the counterparties to those respective agreements is equal to at least thirty (30) percent of the total costs of the EPC or EPC Equivalents.

  • The constructional plant means all appliances, tools, plants or machinery or whatsoever nature required in or about the execution, completion or maintenance of the works but does not include materials or other things intended to form part of the permanent work.

  • Start of construction means the date the development permit was issued, provided the actual start of construction, repair, reconstruction, or improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of the structure such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation, and includes the placement of a manufactured home on a foundation. (Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of buildings appurtenant to the permitted structure, such as garages or sheds not occupied as dwelling units or part of the main structure. (NOTE: accessory structures are NOT exempt from any ordinance requirements) For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.

  • Commencement of Construction means the commencement of construction of foundation components or elements (such as footings, rafts or piles) for the home.

  • Acquisition and Construction Fund means the fund so designated in, and created pursuant to, Section 502 hereof.

  • Pipeline Construction means a substantial disturbance to agricultural land associated with installation, replacement, removal, operation or maintenance of a pipeline, but shall not include work performed during an emergency. Emergency means a condition where there is clear and immediate danger to life or health, or essential services, or a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in accordance with these rules.

  • Building construction means any physical activity on the site involved in the erection of a structure, cladding, external finish, formwork, fixture, fitting of service installation and the unloading of plant, machinery, materials or the like.

  • Residential construction means construction on single-family or two-family dwellings occupied or used, or intended to be occupied or used, primarily for residential purposes, and includes real property pursuant to chapter 499B.

  • as constructed plans means as constructed plans as defined in the Building Code;

  • Means and Methods of Construction means the labor, materials, temporary structures, tools, plant, and construction equipment, and the manner and time of their use, necessary to accomplish the result intended by this Contract.

  • Commence Construction means that an owner or operator has either undertaken a continuous program of construction or has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of construction.

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • Land disturbing construction activity means any man-made alteration of the land surface resulting in a change in the topography or existing vegetative or non-vegetative soil cover, that may result in runoff and lead to an increase in soil erosion and movement of sediment into waters of the state. Land disturbing construction activity includes clearing and grubbing, demolition, excavating, pit trench dewatering, filling and grading activities.

  • Foreign construction material means a construction material other than a domestic construction material.

  • CONSTRUCTION GUARANTEE means a guarantee at call obtained by the contractor from an institution approved by the employer in terms of the employer's construction guarantee form as selected in the schedule

  • Direct Construction Cost means the sum of the amounts that the Construction Manager actually and necessarily incurs for General Conditions Costs, Cost of the Work and Construction Manager’s Contingency during the Construction Phase as allowed by this Agreement. Direct Construction Cost does not include Pre-Construction Phase Fees or Construction Phase Fees.

  • Construction and demolition debris means and includes:

  • Begin actual construction means, in general, initiation of physical on-site construction activities on an emissions unit which are of a permanent nature. Such activities include, but are not limited to, installation of building supports and foundations, laying of underground pipework, and construction of permanent storage structures. With respect to a change in method of operation, this term refers to those on-site activities, other than preparatory activities, which mark the initiation of the change.

  • Estimated Construction Cost or “ECC” means the amount calculated by Contractor for the total cost of all elements of the Work based on this Agreement available at the time(s) that the ECC is prepared. The ECC shall be based on current market rates with reasonable allowance for overhead, profit and price escalation and shall include and consider, without limitation, all alternates and contingencies, designed and specified by A/E and the cost of labor and materials necessary for installation of Owner furnished equipment. The ECC shall include all the cost elements included in the AACC, as defined above, and shall represent Contractor’s best current estimate of the Guaranteed Maximum Price it will propose for the Project based on the information then available. The ECC shall not include Contractor’s Pre-Construction Phase Fee, A/E’s Fees, the cost of the land and rights-of-way, or any other costs that are the direct responsibility of Owner.

  • Constructional Plan means all appliances or things of whatsoever nature required for the execution, completion or maintenance of the works or temporary works (as hereinafter defined) but does not include materials or other things intended to form or forming part of the permanent work.