Examples of Type 2 Installation in a sentence
Between Type 1 Installation and Type 2 Installation: Bi-directional communication (including data transfers) shall be permitted between SW or TPD in Type 1 Installations and SW in Type 2 Installations.
Between Type 1 Installation and Type 2 Installation: Bi- directional communication (including data transfers) shall be permitted between SW or TPD in Type 1 Installations and SW in Type 2 Installations.
Between Type 2 Installation and Type 3 Installation: c) Між Установкою 2-го типу та Установкою 3-го типу.
Type 2 Installation Line Main Breaker2-Pole, 20 A circuit breaker shown A=Black (Line) B=Black (Line)C=Neutral/Grounded (White)1.
Between Type 1 Installation and Type 2 Installation: Bi-directional communication (including data transfers) shall be permitted between SW or TPD in Type 1 Installations and SW in Type 2 Installations./ Antara Instalasi Jenis 1 dan Instalasi Jenis 2: Komunikasi dua arah (termasuk transfer data) akan diperbolehkan antara SW atau TPD dalam Instalasi Jenis 1 dan SW dalam Instalasi Jenis 2.
Figure 1.8 Type 2 Installation —Shielded Cable with Brake Conductors Drain Wire for Brake ConductorShield Shield for W GBrake R BConductors Type 3 InstallationThese cables have 3 XLPE insulated copper conductors, 25% minimal overlap with helical copper tape and three (3) bare copper grounds in PVC jacket.TIP: Other types of shielded cable are available, but the selection of these types may limit the allowable cable length.
If a sewer pipe is being installed, make a hydrostatic pressure-leakage test in accordance with Section 02958 – Leakage Testing of Sewers, Volume 3 Drainage.5.6 If the casing is in tunnel, install backfill grout to fill the entire tunnel cross-section.5.7 Beyond the ends of the casing, install the sewer in a Type 2 Installation or a higher class if specially designated.
Type 2 Installation Main Breaker2-Pole, 20 A circuit breaker shown A=Black (Line) B=Black (Line) C=Neutral (White) Type 2 installation:A typical installation of a type 2 SPD will be connected to the load side of the service panel and is intended to be installed with overcurrent protection to the SPD.1. Determining location:• Ensure conductor lengths are as short and straight as possible for best performance.
Upgrade Type 2: Installation of secondary containment for existing tanks.
The EAA requests costs and estimated lead/construction time for the following facility Upgrade Types, with consideration given to the requirements discussed in Section 3.2.1 of this proposal document: Upgrade Type 1: Installation of smaller tanks.Upgrade Type 2: Installation of secondary containment for existing tanks.