Examples of Trenched in a sentence
These aredefined below and illustrated in Figure 120-1, Types of Trenched Construction.• Open cut construction: Requires cutting of existing paved roadways or shoulders, which includes both crossing and longitudinal installations as well as window cuts to accommodate bore pits or service connections.• Trenched construction within the roadway prism: Includes longitudinal installations and window cuts to accommodate bore pits or service connections.• Trenched construction outside the roadway prism.
Utilities (Trenched): Maximum of 400 feet spacing along the utility.
The installation, other than in the roadway or median, will create an undue hardship or financial burden by reason of terrain, geology, or environmental damage along the road- side.(4) Trenched crossing in the roadway as defined in WAC 468-34-110(7) shall be considered a variance from this pol- icy.
Trenched combination footings and foundation walls may only be used in cohesive soils such as clay, where the walls of the trench shall be square cut in a straight line to afford proper bearing for the superstructure walls to be built on top of it and where the trench walls will support themselves without flaking off into the trench during the concrete pour.
Exception: Trenched combination footings and foundations are permitted in cohesive soils when designed by an Illinois licensed Architect or Structural Engineer and installed consistent with a soils analysis, report, and recommendation by an Illinois licensed Soils Engineer.
Trenched construction, bedding, and backfill normally will be adequately controlled if the utility company is required to conform to the department's standard specifications for earthwork and culverts.
The table below contains details of numbers of doctors with a prescribed connection with ASPH on 31st March 2016 and completed appraisal rates for doctors by role/job title: Job Title/RoleNumber of Doctors 2014/15Completed Appraisals 2014/15*Number of Doctors 2015/16Completed Appraisals 2015/16*Permanent Consultants(incl.
Trenched Construction and Backfill-- From the highway viewpoint, the essential features for trench and back-fill construction are: (a) restoration of the structural integrity of entrenched roadbed; (b) security of the pipe against deformation likely to cause leakage; (c) assurance against the trench becoming a drainage channel; and (d) assurance against drainage being blocked by the backfill.
Grading and Stockpiling Trenched Material: Control the stockpiling of trenched material in a manner to prevent water running into the excavations.
Basis of Payment The work of Trenched Widening, measured as provided herein, will be paid for at the contract unit price per Station for the item "Trenched Widening".