Final Stabilization means that all soil disturbing activities at the site have been complete, and that a uniform perennial vegetative cover with a density of 70% of the cover for unpaved areas and areas not covered by permanent structures has been established or equivalent permanent stabilization measures (such as the use of riprap, gabions, or geotextiles) have been employed.
Crisis stabilization means emergency, psychiatric, and substance abuse services for the resolution of crisis situations and may include placement of an individual in a protective environment, basic supportive care, and medical assessment, and, if needed, referral to an ODMHSAS certified facility having nursing and medical support available.
Crisis stabilization unit means a short-term facility or a
Stabilization means providing adequate measures, vegetative and/or structural, that will prevent erosion from occurring.
Post Stabilization Services means contracted services, related to an emergency medical condition that are provided after an enrollee is stabilized in order to maintain the stabilized condition or to improve or resolve the enrollee's condition (42 CFR 438.114 and 422.113).
Post-Stabilization Care means Medically Neces- sary services received after the treating physician determines the emergency medical condition is stabilized.
Development regulations or "regulation" means the controls
Mobilization means establishment of sufficiently adequate infrastructure by the CONTRACTOR at "SITE" comprising of construction equipments, aids, tools tackles including setting of site offices with facilities such as power, water, communication etc. establishing manpower organisation comprising of Resident Engineers, Supervising personnel and an adequate strength of skilled, semi-skilled and un-skilled workers, who with the so established infrastructure shall be in a position to commence execution of work at site(s), in accordance with the agreed Time Schedule of Completion of Work. "MOBILISATION" shall be considered to have been achieved, if the CONTRACTOR is able to establish infrastructure as per Time Schedule, where so warranted in accordance with agreed schedule of work implementation to the satisfaction of ENGINEER-IN-CHARGE/ EMPLOYER.
service delivery and budget implementation plan means a detailed plan approved by the executive mayor of a municipality in terms of section 53(l)(c)(ii) of the MFMA for implementing the municipality's delivery of municipal services and its annual budget, and which must indicate
Implementation means the activity between formal approval of an E911 service plan and a given system design, and commencement of operations.
Transitional housing means buildings configured as rental housing developments, but operated under program requirements that require the termination of assistance and recirculating of the assisted unit to another eligible program recipient at a predetermined future point in time that shall be no less than six months from the beginning of the assistance.
Initial Development Plan has the meaning set forth in Section 3.2(b).
Interim Number Portability or “INP” means the use of existing and available call routing, forwarding, and addressing capabilities (e.g. remote call forwarding) to enable a Customer to receive Telephone Exchange Service provided by any Local Exchange Carrier operating within the exchange area with which the Customer’s telephone number(s) is associated, without having to change the telephone number presently assigned to the Customer and regardless of whether the Customer’s chosen Local Exchange Carrier is the carrier that originally assigned the number to the Customer.
Additional SDU Study means a deliverability study that a Developer may elect to pursue as that term is defined in OATT Section 25 (OATT Attachment S). For purposes of Section 23.4.5 of this Attachment H, “Affiliated Entity” shall mean, with respect to a person or Entity:
Transition means: 1) the formal and physical process of transferring from school to school or 2) the period of time in which a student moves from one school in the sending state to another school in the receiving state.
Professional Staff means the Medical Staff, Dental Staff, Midwifery Staff and Extended Class Nursing Staff;
Transitional Services means services involving technical or specialized knowledge required to complete a project or to provide temporary consulting services to the City.
Implementation Period means the period from the date of signing of the Agreement and up to the issuance of Final Acceptance Certificate for the project.
Technical Standards means the technical standards set out in paragraph 2.4 of the Order Form;
Project Implementation means all steps which the Grantee undertakes in order to deliver the Project which is being supported by funding provided under this Grant Contract. Any reference to UK primary legislation (Acts) or secondary legislation (Statutory Instruments) in this Grant Contract includes reference to any changes to or replacement of those Acts or Statutory Instruments.
Change Management means the add-on module to the Programs that enables engineers to define network changes through one or more configuration templates. Those network changes can be applied to multiple devices and executed/rolled back automatically. The Change Management module enables engineers to verify the impact of the changes across the network to help ensure a safer change process.
Sustainability Structuring Agent means X.X. Xxxxxx Securities LLC, in its capacity as sustainability structuring agent hereunder.
medium term expenditure framework ’ means a budgeting framework applied by the National Treasury which—
FIRM PROCUREMENT means the agreement between the parties for mutually agreed terms and conditions with commitment of Quantity Ordered.
Nuclear fuel cycle-related research and development activities means those activities which are specifically related to any process or system development aspect of any of the following: - conversion of nuclear material, - enrichment of nuclear material, - nuclear fuel fabrication, - reactors, - critical facilities, - reprocessing of nuclear fuel, - processing (not including repackaging or conditioning not involving the separation of elements, for storage or disposal) of intermediate or high-level waste containing plutonium, high enriched uranium or uranium-233, but do not include activities related to theoretical or basic scientific research or to research and development on industrial radioisotope applications, medical, hydrological and agricultural applications, health and environmental effects and improved maintenance.
Stabilize means to provide medical treatment of the condition as may be necessary to assure, with reasonable medical probability, that no material deterioration of the condition is likely to result from or occur during the transfer of the individual from a facility, or, with respect to a pregnant woman who is having contractions, when there is inadequate time to safely transfer her to another hospital before delivery (or the transfer may pose a threat to the health or safety of the woman or un- born child), “Stabilize” means to deliver (includ- ing the placenta).