Examples of Time Bar in a sentence
The Supplier shall submit a detailed Time Bar Chart within 15 days of the placement of order indicating number of activities covering various key phases of manufacturing and installation works such as procurement, manufacturing, despatch etc.
The Contractor shall furnish a Time Bar Chart showing breakup of time required for various activities viz., submission and approval of drawings, raw material procurement, engineering, various shop activities, order placement for bought out items and their delivery to shop, assembly, testing, inspection, dispatch, erection and commissioning.
The Programme so prepared shall be rearranged in the form of a Time Bar- chart Schedule of which size shall be in A3).
Time Bar If the Contractor fails to comply with clause 16.1, 16.2, 16.3 or 16.4: the Commonwealth will not be liable (insofar as it is possible to exclude such liability) upon any Claim by the Contractor; and the Contractor will be absolutely barred from making any Claim against the Commonwealth, arising out of or in connection with the relevant direction or fact, matter or thing (as the case may be) to which clause 16.1 or 16.2 applies.
Time Bar If the Consultant fails to comply with clause 13.1, 13.2, 13.3 or 13.4: the Commonwealth will not be liable (insofar as it is possible to exclude such liability) upon any Claim by the Consultant; and the Consultant will be absolutely barred from making any Claim against the Commonwealth, arising out of, or in any way in connection with, the relevant direction or fact, matter or thing (as the case may be) to which clause 13.1 or 13.2 applies.
This Time Bar- chart Schedule shall be submitted to the Engineer together with the CPM Network.
Dynamic context is only available for some components, such as Bar or Pie Chart, Cluster Bar Chart, Time Bar Chart, Time Plot Chart, Drop-Down List, Filter, Radio Button List, Row-Oriented Table, Tree Table, and Topology.
The tenderer shall furnish a Time Bar Chart showing breakup of time required for various activities viz., submission and approval of drawings, raw material procurement, engineering, various shop activities, order placement for bought out items and their delivery to shop, assembly, testing, inspection, dispatch, erection and commissioning.
Time Bar on paymentPayment shall be released within 30 days after checking the entries made on measurement book and certification of the progress bill (R/A Bill) by Engineer-in-charge.
See Mahir Jalili, Time Bar Clauses in Saudi Arabian Contracts, 13 International Construction Law Review 488, 490-91 (1996).