Test Yield definition

Test Yield means the ratio, expressed in percentage, of the number of Products (Units) started at Electrical Test to the number meeting Specifications after Electrical Test, as depicted in the typical test flow in Schedule C.
Test Yield means the average discharge rate of the constant discharge pumping test conducted on a borehole;
Test Yield means the ratio, expressed in percentage, of the number of Units of a specific Product meeting Specifications after Electrical Test and all further inspections and performance tests to the number thereof introduced into the Electrical Test process (Assembly Outs). Both Contractor and Company understand that the condition of the Materials and the precision of execution of the assembly process strongly influence the yield at test. Both Contractor and Company will work together to maximize Test Yield. Test Yield shall include Fine and Gross Leak Test, Electrical Test and Test Final Visual Inspection. TY = (AO – S – O –TR – FI)/AO Where:

Examples of Test Yield in a sentence

  • Should either party incur unacceptable yield loss (Assembly Yield loss or Test Yield loss), based on monthly average yield, either party may request a failure analysis to determine the cause of such failures.

  • Except as provided in paragraphs 2.5.3 and 10.2.1, the Contractor shall be responsible for Test Yield.

  • Test Yield will include Fine Leak and Gross Leak Testing, Electrical Test, and Test Final Visual Inspection, unless otherwise specified in the Schedule for the particular Product Family incorporated into this Agreement.

  • Anything herein to the contrary notwithstanding, if Product is priced appropriately, an option is available for the Electrical Test portion of Test Yield to be a shared responsibility of Contractor and Company during the first three months of Manufacture following successful qualification or evaluation testing of Product.

  • Pegasus Project parts shall achieve an Integrated Test Yield ("ITY") of at least sixty-five (65%) percent in accordance with the Specifications in Exhibit R.

  • Contractor will periodically supply Company with reasonably requested data including, but not limited to Assembly Yield, Test Yield, inventories and production status.