Test Requirements definition

Test Requirements means the test plans and test procedures set forth in Exhibit D (Test Plan Requirements), as may be amended pursuant to this Contract.
Test Requirements means the test requirements set forth in Exhibits A and B, as may be amended pursuant to this Agreement.
Test Requirements has the meaning given in paragraph 1.12 of Part A of this Schedule 6.2;

Examples of Test Requirements in a sentence

  • ASTM Test Requirements Type -- Unsupported between posts Apparent opening size D 4751 No. 30 max., No. 100 min.

  • Seller shall ensure that the conceptual design and detailed design conforms to the Scope Book, as well as the other requirements of this Agreement, and will enable the Project to meet the Guaranteed LD Performance Test Requirements, Guaranteed PV Plant Availability, and Guaranteed ▇▇▇▇ Availability and Seller to achieve Final Completion.

  • If the Project Performance Test Results of such Optional Project Performance Re-Test show that one or more of the Minimum Performance Test Requirements were not achieved, Seller shall, at its sole expense, conduct additional Optional Project Performance Re-Tests until the Project Performance Test Results show that all of the Minimum Performance Test Requirements have been achieved.

  • If the Project does not meet the Minimum Performance Test Requirements, Seller shall take corrective action and repeat the Performance Test until the Performance Test is Successfully Run and the Minimum Performance Test Requirements are met.

  • The Substantial Completion Payment Date shall be extended day for day for each day that the Project Performance Test Results show that the Minimum Performance Test Requirements have not been achieved.

  • ASTM Test Requirements Water permittivity D 4491 0.02 sec-1 Grab tensile strength D 4632 180 lb in machine direction, 100lb in cross-machine direction Metallic coated steel culverts shall meet AASHTO M-36 (ASTM A-760) specifications.

  • Test Requirements and acceptance criteria are specified in the Contract Documents.

  • ASTM Test Requirements Type -- Non-woven Apparent opening size D 4751 No. 80 max Water permittivity D 4491 0.3 sec-1 Grab tensile strength D 4632 160 lb Grab tensile elongation D 4632 = 50% Puncture strength D 6241 310 lb Tear strength D 4533 50 lb Ultraviolet stability D 4355 50% retained after 500 hours of exposure Purchaser shall provide 1 unused roll of fabric, at the completion of the sale any unused materials will become the property of the state.

  • ASTM Test Requirements Type -- Woven Apparent opening size D 4751 No. 40 max Water permittivity D 4491 0.10 sec-1 Grab tensile strength D 4632 315 lb Grab tensile elongation D 4632 <50% Puncture strength D 6241 620 lb Tear strength D 4533 112 lb Ultraviolet stability D 4355 50% retained after 500 hours of exposure Geotextiles must meet the following minimum requirements for strength and property qualities, and must be designed by the manufacturer to be used for filtration.

  • With respect to each Performance Test, if Seller achieves the Minimum Performance Test Requirements pursuant to such Successfully Run Performance Test but cannot achieve the Minimum Guaranteed Plant Capacity, in the case of a Plant Capacity Test, or the Minimum Guaranteed Plant Reliability, in the case of a Plant Reliability Test , Seller shall pay to Purchaser the related liquidated damages as and when required under Article 15.


More Definitions of Test Requirements

Test Requirements. Test Medium: Water, as specified in this Section Test Pressure: 150 PSI Duration: 120 minutes Leakage: Zero, as specified in this Section
Test Requirements. Medium: Water, as specified in this Section. Pressure: 150 PSI. See Remarks for Seal Water. C3 – 30
Test Requirements. Medium: Preliminary test: Air, Nitrogen, or Inert gas Final test: Lube oil and fuel oil, as specified in this Section. Pressure: 150 PSI (fuel piping, pressure piping)
Test Requirements. Medium: Air; as specified in this Section. Pressure: 15 psig for FA piping 10” and smaller 20” water column for 12” and larger ductwork. Duration: 60 minutes.