Temporary Traffic Control definition
Examples of Temporary Traffic Control in a sentence
The Temporary Traffic Control pay item does not include work zone advance or general warning signs.
Partial payments for Temporary Traffic Control will be made as follows: The cumulative total of the lump sum price for temporary traffic control will be equal to the percent complete (project) as calculated for each partial pay estimate.
If a pilot vehicle is used for an operation, the Lump Sum Price for Temporary Traffic Control will include the work of five (5) flaggers.
Any additional flagging beyond the “included” amount covered in the Temporary Traffic Control pay item will be considered supplemental flagging and compensated at a rate of $20.00 per hour for each additional flagger as approved by the Engineer.
Payment will be made under: Temporary Traffic Control Lump Sum Work Zone Advance/General Warning Signing Square Foot (7-15-14) RWZ-2 Coordinate the installation of items required by the contract documents and resurfacing operations such that these operations are completed in the order as agreed upon with the Engineer at the first pre-construction meeting.
The Lump Sum price for Temporary Traffic Control will include the work of four (4) flaggers per operation per map being utilized at the same time on any day.
Developer shall conduct traffic management in accordance with all applicable Technical Provisions, Laws and Governmental Approvals, and in accordance with the Transportation Management Plan and Temporary Traffic Control Plans.
The Lump Sum price for Temporary Traffic Control will include the work of 4 flaggers per operation per map being utilized at the same time on any day.
Payment for Work Zone The Lump Sum price for Temporary Traffic Control will include the work of four (4) flaggers per operation per map being utilized at the same time on any day.
Payment will be made under: Temporary Traffic Control Lump Sum Work Zone Advance/General Warning Signing Square Foot 11/14/2017 (7-15-14) RWZ-2 Coordinate the installation of items required by the contract documents and resurfacing operations such that these operations are completed in the order as agreed upon with the Engineer at the first pre-construction meeting.