The operability study approved by the COES for the incorporation of the Project to the SEIN, which shall contain the specifications set out in Technical Procedure COES PR- 20.
The connection authorization by the COES to carry out the tests, as set out in its Technical Procedure COES PR-20 (or the procedure replacing it) indicating the dates and times for their execution.
The Supervisor shall issue a Report confirming that said engineering plans comply with the technical scope specified in Annex 1 and the Pre-Operating Study, approved in accordance with CEOS Technical Procedure No. 20, as substituted.
Experimental Operation shall be performed for a period of thirty (30) calendar days, beginning upon the successful completion of the Project Test Verification Procedure contained in Annex 2, with the OSINERGMIN’s approval of the final report referred to in said annex and after the COES approves the Project’s integration into the SEIN (in accordance with Technical Procedure COES PR-20, as substituted, and the Applicable Laws and Provisions).
Then, the CONCESSIONAIRE shall submit said certificates to the OSINERGMIN and the COES, attaching to the latter, the information indicated in Technical Procedure COES PR-20, for the integration of the Project to the SEIN.
For the new substation, the CONCESSIONAIRE shall acquire the necessary land, including the areas for future expansions, established in this annex and as indicated in Chapter 1, Annex 1 of the Technical Procedure PR-20.
The POS shall comply with the provisions of Technical Procedure COES PR-20 and cover, among other things, the following aspects: ▪ Studies of steady-state operation for different generation and load conditions.
Technical Procedure COES PR-20, or the procedure replacing it, shall be applied.
Design criteria used in developing the project shall be consistent with the existing facilities and with the design criteria established in Technical Procedure COES PR-20 "Entry, Modification and Removal of Facilities in the SEIN" and with the requirements of the National Electricity Code CNE- Supply and CNE-Utilization, as well as other standards specified in the annex herein, in force at the date of signing the agreement.
Following the criteria set out in Chapter 2, Annex 1 of Technical Procedure PR-20 of COES, the transmission system protection shall be comprised of primary and backup protection.