Task C. FINAL DESIGN 1,000 GPM PS :
Task C shall have the meaning ascribed to it in Section 2.1.1.3.
Task C. Prepare final report recommending proposed policy revisions lor adoption This task includes the development of a draft Policy Report on the Revised Policy that provides an overview and supporting discussion pertaining to the recommended changes to the proposed Draft Policy. This report may be developed by both the Consultant Team and Utilities. The Consultant Team's portion of the report will focus on specific policy changes and additions relative to the 2003 Policy while the Utilities' portion may provide background supporting information and may be atlached as an appendix or be within the interior of the document. Versions of this report will be prepared in tandem with the draft proposed Policy discussed in Task 1.5. An electronic outline will be developed in advance of CWG Meeting #5 to provide internal direction and focus for the Project Team. The first draft at 70% completion will be developed in preparation for CWG Meeting #6 where the content of the report will be orally presented at the meeting. The second draft will incorporate the CWG's comments and the third draft will incorporate the Utilities' comments prior to submission to the Water Board. The fourth draft will incorporate the Water Board's and Utilities' comments prior to submission to City Council. Assumptions: • Understanding the evolving nature of this process, the need for certain drafts may change. For cost estimating purposes, it is assumed this task includes up to four drafts; however, the number of drafts may be adjusted depending on the needs of the Utilities. • Utilities will provide comments (one consolidated set, in 'track changes') in response to each of the first and third drafts. • The first draft will be 70% completed. This percentage applies to the portion of the document that the Consultant Team is developing. • Preparation of the second, third and fourth drafts will each involve one conference call with Utilities to discuss comments received from Utilities and (in the case of the third draft) the CWG. These conference calls are included in the weekly conference calls scoped under Task 4. • The length of the first draft of this report is assumed to be six to eight pages. The Utilities may provide additional detail in subsequent drafts of this report. Deliverables: • Electronic Outline of Draft Report in advance of CWG Meeting #5 • First Draft Report for CWG Meeting #6 (70% completed) incorporating Utilities comments on outline • Second Draft Report in response to CWG Meeti...

Examples of Task C in a sentence

  • The level of QA/QC reporting shall be indicated by the DQA specified in Table 1 of Task C.

  • Based upon the project programming and Planning Workshop completed as Task C, develop Schematic Design Drawing(s) for improvement of the Outdoor Athletic Facilities.

  • The in-situ biofilter systems for PNRSII will be constructed in Phase II along with the mini-mounds for Task C.

  • Prepare Performance Report Within 30 days of completing Task C 1.

  • It is anticipated that multiple options may be required to fully explore all potentials as may be identified in Task C.

  • Both sides agree on the following new costs for D3, D4 and D5 for Task B: Item Original Price (EUR) New Price (EUR) Due Delivery schedule ▇▇▇▇ ▇-▇▇▇ 50,000.00 120,000.00 01/12/2018 ▇▇▇▇ ▇-▇▇▇ 50,000.00 100,000.00 28/02/2019, no change ▇▇▇▇ ▇-▇▇▇ 50,000.00 51,000.00 20/06/2019, no change The contractor confirms and ITER Organization accepts that the related labour costs for Task C defined in the Technical Specification will be provided by the Contractor for free.

  • Task C Construction • Location Map: The Project site map is attached hereto as Appendix F which consists of eight pages (F-1 through F-8).

  • Task C shall be completed upon submission to Rayton by PNL of the Task C Report (“Task C Completion”).

  • Task A: Start up – design guidelines, map layout, narrative info Task B: Data Exchange and Assembly Task C: Map/Narrative production of drafts.

  • Description Current Amend Proposed Task A: Project Management $105,100 $0 $105,100 Task B: Preliminary Design $174,751 $0 $174,751 Task C: Final Design Phase $523,953 $0 $523,953 Task D: Bid Phase $40,091 $0 $40,091 Task E: Construction Phase General Rep.


More Definitions of Task C

Task C. When Ci receives St(Lid, Rnd, Tag, Val, DVal) from Aj % Maintaining the most recent information ever observed

Related to Task C

  • Task means a fixed quantity of work;

  • Work crew means a program of partial confinement

  • Project Description means the document that describes the Project's Reduction activities and that uses either the VCS Project Description Template or the project description template specified by the relevant Approved GHG Program;

  • Task Order means a separate order issued under this Contract.

  • Work Plan means a plan that describes each individual activity to be conducted to complete eligible activities and the associated costs of each individual activity.