Target Completion definition

Target Completion means that all of the following have occurred with respect to the Facility: (i) Cool Down has been completed for System 1 and System 2; (ii) Contractor has completed all procurement, fabrication, assembly, erection, installation and precommissioning checks of all of the vaporizers for the Facility to ensure that all such vaporizers and each component thereof was sufficiently fabricated, assembled, erected and installed so as to be capable of being operated safely within the requirements contained in this Agreement, and thirteen vaporizers have been operated to their rated capacity; (iii) Contractor has completed all procurement, fabrication, assembly, erection, installation and pre-commissioning checks and tests of System 1 and System 2 to ensure that these Systems and each component thereof was sufficiently fabricated, assembled, erected and installed so as to be capable of being operated safely within the requirements contained in this Agreement; and (iv) System 1 and System 2 collectively achieve a Sendout Rate of 2,000 MMSCFD or above at a temperature of no less than 40°F and at a pressure of no less than 1,250 PSIG, as measured at the exit for the main Facility transfer meter, for a continuous period of a minimum of twenty-four (24) hours.
Target Completion. While development will be ongoing, Curator will work to ensure that the Project remains on schedule for the exhibit to open in March 2024.
Target Completion means that all of the following have occurred with respect to the Facility: (i) Cool Down has been completed for System 1 and System 2; (ii) Contractor has completed all procurement, fabrication, assembly, erection, installation and precommissioning checks of all of the vaporizers for the Facility to ensure that all such vaporizers and each component thereof was sufficiently fabricated, assembled, erected and installed so as to be capable of being operated safely within the requirements contained in this Agreement, and thirteen vaporizers have been operated to their rated capacity; (iii) Contractor has completed all procurement, fabrication, assembly, erection, installation and pre-commissioning checks and tests of System 1 and System 2 to ensure that these Systems and each component thereof was sufficiently fabricated, assembled, erected and installed so as to be capable of being operated safely within the requirements contained in this Agreement; and (iv) Contractor has successfully completed the Target Completion Test as defined in Attachment S.

Examples of Target Completion in a sentence

  • Notes on Calculation of Target Completion is defined as the number of overweight/obese children aged 7-13 years who complete three or more sessions, as per the once per week delivery model of the Targeted Family Healthy Eating and Physical Activity Program.

  • Task I.2 - Reservoir Characterization (Target Completion Date: 3/3/96).

  • Task I.1 - Acquisition and Consolidation of Available Data (Target Completion Date: 4/2/95).

  • If the PV System has not achieved Substantial Completion by the Target Completion Date, the Deposit will be forfeited to the Renewable Energy Standard Adjustment account in an amount equal to 1/180th of the Deposit per day for each day following the Target Completion Date that the PV System has not been brought to Substantial Completion, not to exceed the Deposit.

  • The report shall include, but not limited to: State Agency, Dollar Amount, Target Completion Date, Actual Completion Date, Pass-Through Costs and if applicable Commission Percentage.

  • In addition, the Consultant may request in writing from the Owner an extension of the Target Completion Date and Timeline for reasons wholly or partially beyond the Consultant’s control, and the Owner shall not unreasonably deny such request.

  • No liquidated damages shall be due to the Owner during such time that the Target Completion Date and Timeline have been extended by the Owner.

  • As liquidated damages (and not as a penalty) for the Consultant’s failure to meet the Target Completion Date and Timeline included in Exhibit A, the Consultant shall be liable to the Owner in the amount of $25 per day for each day that the Consultant is late in meeting any such Target Completion Date and Timeline.

  • The Consortium shall use reasonable efforts to perform the following obligations in accordance with the Target Completion Dates set forth in Section E below.

  • The Developer will commence construction of the Project promptly after the Closing and will expeditiously pursue completion of construction with a completion date not later than the Target Completion Date, subject to Force Majeure events and to Authority Delay.


More Definitions of Target Completion

Target Completion means that all of the following have occurred with respect to the Facility: (i) Cool Down has been completed for System 1 and System 2; (ii) Contractor has completed all procurement, fabrication, assembly, erection, installation and pre-commissioning checks of all of the vaporizers for the Facility to ensure that all such vaporizers and each component thereof was sufficiently fabricated, assembled, erected and installed so as to be capable of being operated safely within the requirements contained in this Agreement, and thirteen vaporizers have been operated to their rated capacity; (iii) Contractor has completed all procurement, fabrication, assembly, erection, installation and pre-commissioning checks and tests of System 1 and System 2 to ensure that these Systems and each component thereof was sufficiently fabricated, assembled, erected and installed so as to be capable of being operated safely within the requirements contained in this Agreement; and (iv) System 1 and System 2 collectively achieve a Sendout Rate of 2,000 MMSCFD or above at a temperature of no less than 40°F and at a pressure of no less than 1,420 PSIG as measured at the exit for the main Facility transfer meter, for a continuous period of a minimum of twenty-four (24) hours. Adjustment to Payment Schedule: See attached Payment Schedule, “Increased Sendout Pressure from 1250 to 1440 PSIG - Phase I and II,” dated December 9, 2005, 1 page. Adjustment to Minimum Acceptance Criteria: The following sections are replaced: Attachment T

Related to Target Completion

  • Target Completion Date has the meaning given such term in Section 3.3(b).

  • Project Completion means completion of the Redevelopment in accordance with this Agreement to the state where the whole of the Morley Shopping Centre, as so redeveloped, is capable of occupation for its intended purpose;

  • Project Completion Date means the date on which the Completion Certificate is issued;

  • project completion period means the period of sixty (60) months commencing from and expiring on for the construction and obtaining of Temporary Occupation Permit or Permits for the whole of the Development as provided in clause 3.3;

  • Project Completion Schedule means the progressive Project Milestones set forth in Schedule-J for completion of the Project Highway on or before the Scheduled Completion Date;

  • Final Completion means the date determined and certified by A/E and Owner on which the Work is fully and satisfactorily complete in accordance with the Contract.

  • Study Completion means the database for the Study has been locked and all Essential Documents have been provided to the Sponsor, including a copy of the letter from the Reviewing HREC acknowledging receipt of the final report and/or closure letter from the Principal Investigator.

  • Construction Completion means physical construction of a cleanup action component is complete.

  • Construction Completion Date means the date by which the overall development of the Project is completed in accordance with the provisions of this Agreement and when the Construction Completion Certificate is issued by the Independent Engineer as per Article 14.1.

  • Completion Date means the date of completion of the Services by the Service Provider as certified by the Procuring Entity

  • Completion Schedule means the fulfilment of the Related Services by the Supplier in accordance with the terms and conditions set forth in the Contract;

  • Substantial Completion means the stage in the progress of the work as determined and certified by the Contracting Officer in writing to the Contractor, on which the work (or a portion designated by the Government) is sufficiently complete and satisfactory. Substantial completion means that the property may be occupied or used for the purpose for which it is intended, and only minor items such as touch-up, adjustments, and minor replacements or installations remain to be completed or corrected which:

  • Testson Completion means the tests which are specified in the Contractor agreed by both Parties or instructed as a Variation, and which are carried out under Clause 9 [Tests on Completion] before the Works or a Section (as the case may be) are taken over by the Procuring Entity.

  • Completion means the fulfilment of the Related Services by the Supplier in accordance with the terms and conditions set forth in the Contract.

  • Scheduled Completion Date shall be the date set forth in Clause 10.3;

  • The Completion Date means the date of completion of the Works as certified by the Employer’s Representative.

  • Tests on Completion means the tests which are specified in the Contract or agreed by both Parties or instructed as a Variation, and which are carried out under Clause 9 [Tests on Completion] before the Works or a Section (as the case may be) are taken over by the Procuring Entity.

  • Virtual Completion means the premise is in the opinion of the Employer fit for occupation.

  • Date of Completion with respect to a Project shall mean: (i) the date upon which such Project and all components thereof have been acquired or constructed and are capable of performing the functions for which they were intended, as evidenced by an Engineers’ Certificate filed with the Trustee and the Issuer; or (ii) the date on which the Issuer determines, upon the recommendation of or in consultation with the Consulting Engineer, that it cannot complete such Project in a sound and economical manner within a reasonable period of time as evidenced by an Engineers’ Certificate filed with the Trustee and the Issuer; provided that in each case such certificate of the Consulting Engineer shall set forth the amount of all Costs of such Project which have theretofore been incurred, but which on the Date of Completion is or will be unpaid or unreimbursed.

  • Time of Completion means the time for completing the execution of and passing the Tests on Completion of the Works of any section or part thereof as stated in the Contract (or as extended under Clause...) calculated from the Commencement Date

  • Final Completion Date means the date on which Final Completion occurs.

  • COMPLETION TIME means the period by ‘date/month’ specified in the ‘Letter of Intent/Award’ or date mutually agreed upon for handing over of the intended scope of work, the erected equipment/plant which are found acceptable by the Engineer, being of required standard and conforming to the specifications of the Contract.

  • Substantial Completion Date means the date on which Substantial Completion occurs.

  • Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.

  • Tests after Completion means the tests (if any) which are specified in the Contract and which are carried out in accordance with the Specification after the Works or a Section (as the case may be) are taken over by the Procuring Entity.

  • Completion Period means the period starting from the date of issue of "Order" and required to complete the work in all respect.