System Integration Test definition

System Integration Test means the date on which a Supplier’s system has been redied for integration with the Company’s head-end system and os tested to demosntarate successful integration.
System Integration Test means the date on which aSupplier’s system has been readied for integration with the Company’s head-end system and is tested to demonstrate successful integration.
System Integration Test means test on various subsystem components of the software which may involve hardware and software to verify the ability of the integrated system to perform intended tasks.

Examples of System Integration Test in a sentence

  • Department System Integration Test Responsibilities Review and approve the system integration testing deliverables.

  • Provider System Integration Test Responsibilities Create all required system integration testing deliverables.

  • It is anticipated that a System Integration Test (SIT) and a Factory Acceptance Testing (FAT) will take place prior to the new PLC control panels being shipped to the project site.

  • System Integration Test, conducted by Contractor, consists of integrated testing of all components of Application Software, as specified in Subtask 6.1 (Conduct System Integration Test) of Exhibit B (Statement of Work).

  • The Contractor shall ensure that the Pre-Integration Test Phase and System Integration Test Phase shall provide for at least three (3) cycles of functional testing to be performed in each Test Stage.

  • The System shall be deemed accepted at the expiration of the System Integration Test unless it is rejected in writing, said writing stating the grounds for COUNTY's rejection and remedies for acceptance.

  • Supply 2 copies of the System Operations manual before the System Integration Test.

  • Upon completion of Supplier's System Integration Test interval, Company agrees to immediately begin to perform testing at Supplier's NOC facility located in Heathrow, Florida, on the Managed Service Node located at said facility, which is connected to Company's ITN, in order for Company to complete items********************** of Section 1.14.

  • The Contractor shall use the Test Management Tool as specified by the Prime DSP in the System Integration Test Phase, User Integration Test Phase and any Enduring Testing.

  • System Integration Test, conducted by Contractor, consists of integrated testing of all components of Application Software, as specified in Subtask 6.1 (Conduct System Integration Test) of the Statement of Work.


More Definitions of System Integration Test

System Integration Test. (“SIT”) means a process in which testers verify that all related systems are functioning correctly with other systems in the same environment and maintaining data integrity.
System Integration Test. ’ means a test of the var-

Related to System Integration Test

  • Commissioning test means tests applied to a distributed generation facility by the applicant after construction is completed to verify that the facility does not create adverse system impacts and performs to the submitted specifications. At a minimum, the scope of the commissioning tests performed shall include the commissioning test specified in Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1547 Section 5.4 "Commissioning tests".

  • Penetration Testing means security testing in which assessors mimic real-world attacks to identify methods for circumventing the security features of an application, system, or network. (NIST SP 800-115)

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).