System Charge definition
Examples of System Charge in a sentence
These amounts shall be calculated by taking the Per Acre Charge and the Out-Letting System Charge and multiplying each by the actual acreage, and deducting from each respective charge, the amounts the Drainage Authority has already paid to the Company for each respective charge.
No later than thirty-five (35) days after the Company’s submission of its Viewer’s Report to the Drainage Authority, the Drainage Authority shall pay for any remaining amounts due and owing for the Per Acre Charge and the Out- Letting System Charge, based upon the actual final acreage evaluated and otherwise determined to be benefitted or damaged.
The Transmission Use of System Charge shall be calculated as defined in ▇▇▇▇▇▇▇▇▇ ▇▇ to Annexure E to the Connection Offer Letter: [x] Namibian Dollars (N$) calculated in accordance with the ECB generation and Transmission methodology which is based on the average generation from each generator during the peak load flow in the Transmission system (such amount will be reviewed annually in accordance with the ECB approval).
The Energy Payment to be paid by NamPower to the Seller shall include, among other components, transmission charges provided for in the Transmission Connection Agreement including the Transmission Use of System Charge, which is set in Namibian Dollars (N$) per month and is calculated in accordance with applicable ECB Generation and Transmission tariff methodology.
No later than thirty (30) days after the Company’s submission of its Viewer’s Report to the Drainage Authority, the Drainage Authority shall pay for any remaining amounts due and owing for the Per Acre Charge and the Out- Letting System Charge, based upon the actual final acreage evaluated and otherwise determined to be benefitted or damaged.
No later than thirty-five (35) days after the Company’s submission of its Viewer’s Report to the Drainage Authority, the Drainage Authority shall pay for any remaining amounts due and owing for the Per Acre Charge and the Out-Letting System Charge, based upon the actual final acreage evaluated and otherwise determined to be benefitted or damaged.
The monthly charge per kilowatt (kW) shall be one-twelfth of the sum of the Main Grid Charge and the Secondary System Charge, as applicable and as specified in the agreement.
This is to be equal to the “Initial Balancing System Charge Window” applicable to the Facility Generation Technology listed in Table M of the CfD Standard Terms Notice issued on 15 August 2014 by the Secretary of State for Energy and Climate Change.
The Secondary System Charge per kilowatt shall be the sum of one or more of the Secondary System annual charges, as specified in the agreement.
The entire cost of the temporary line extension and permanent line extension required to extend service from the substation to the Project and shall be paid by Customer, with the balance of $*** (less the credit of $*** referenced in section 4.F above) being collected through the Distribution System Charge contained on the attached rate Schedule.