Surface Treatment definition
Examples of Surface Treatment in a sentence
Asphalt Surface Treatment: Fog Seal will be measured and paid at the contract unit price per square yard.
The Asphalt Surface Treatment (AST) shall be warranted by the project payment and performance bonds for a period of 12 months.
Aggregates for Asphalt Surface Treatment 1012-2 Emulsified Asphalt, Grade CRS-2L 1020-3 Emulsified Asphalt, Grade CRS-2P 1020-3 Fine Aggregate 1014 Mineral Filler 1012-1(D) Water 1024-4 Before any asphalt surface treatment is placed, obtain from the asphalt supplier and furnish to the Engineer a Certification of Compatibility of the emulsion with the aggregate proposed for use.
Grinding to remove painted markings is only allowed prior to application of a Bituminous Surface Treatment (BST).
Asphalt Surface Treatment: Single Seal, Double Seal, Triple Seal, Mat and Single Seal, Mat and Double Seal, Fog Seal, Sand Seal, and Mat Coat, No. Stone.
Aggregates for Asphalt Surface Treatment 1012-2 Emulsified Asphalt, Grade CRS-2L 1020-3 Emulsified Asphalt, Grade CRS-2P 1020-3 Emulsified Asphalt, Grade CRS-1H 1020-3 Emulsified Asphalt, Grade CSS-1H 1020-3 Emulsified Asphalt, Grade CQS-1H 1020-3 Fine Aggregate 1014 Mineral Filler 1012-1(D) Water 1024-4 Before any asphalt surface treatment is placed, obtain from the asphalt supplier and furnish to the Engineer a Certification of Compatibility of the emulsion with the aggregate proposed for use.
The Granular Base and/or the Asphalt Pavement/Bituminous Surface Treatment are less than 10 years old and have 20 to 30 years remaining life.
Should either City or County determine that the Treatment Area requires work beyond the scope of the Surface Treatment set forth in Section 1 of this Agreement, the initiating party shall request in writing such modifications and, if agreed to by the parties, a separate agreement between the parties shall be documented prior to any construction of such work.
Install advance/general warning work zone signs according to the Detail Drawing titled Signing for Asphalt Surface Treatment provided in these plans.
The Granular Base and/or the Asphalt Pavement/Bituminous Surface Treatment are 10-20 years old, and have 10 to 20 years remaining life.