Examples of Stormwater Management Practice in a sentence
Stormwater Management Practice (SMP): Any man-made structure that is designed and constructed to detain, infiltrate, or otherwise control stormwater runoff quality, rate, or quantity.
The qualified inspector shall, by signing the “Final Stabilization” and “Post-Construction Stormwater Management Practice certification statements on the NOT, certify that all the requirements in PartV.A.2.a. or b.
Post-construction Stormwater Management Practice Requirements The owner or operator of a construction activity that requires post- construction stormwater management practices pursuant to Part III.C. of this permit must select, design, install, and maintain the practices to meet the performance criteria in the New York State Stormwater Management Design Manual (“Design Manual”), dated January 2015, using sound engineering judgment.
Preservation of Undisturbed Areas Preservation of Buffers Reduction of Clearing and GradingLocating Development in Less Sensitive Areas Roadway ReductionSidewalk Reduction Driveway Reduction Cul-de-sac ReductionBuilding Footprint Reduction Parking Reduction Post-construction Stormwater Management Practice (SMP) RequirementsImportant: Completion of Questions 27-39 is not required if response to Question 22 is No.27a.
Stormwater Management Practice (SMP): Any man-made or natural structure, system, landscape feature, channel, or improvement designed, constructed, installed, and/or used to detain, infiltrate, or otherwise control stormwater runoff quality, rate, or quantity.
This strategy is to be in accordance with the “Low Impact Development Stormwater Management Practice Inspection and Maintenance Guide” prepared by Toronto and Regional Conservation Authority.
Post-construction Stormwater Management Practice Requirements The owner or operator of a construction activity that requires post- construction stormwater management practices pursuant to Part III.C. of this permit must select, design, install, and maintain the practices to meet the performance criteria in the New York State Stormwater Management Design Manual (“Design Manual”), dated January 2015, using sound engineering judgment.
Summary of Stormwater Management Program Activities for Annual Reporting Year 2019 (July 1 – June 30) Stormwater Management Practice or Activity2014-20152015-20162016-20172017-20182018-20192.
A requirement of the Resource Management Department to maintain public records of the results of the site inspections, to inform the responsible party responsible for maintenance of the inspection results, and to specifically indicate any corrective actions required to bring the Stormwater Management Practice into proper working condition.
Summary of Stormwater Management Program Activities for Annual Reporting Year 2019 (July 1 – June 30) Stormwater Management Practice or Activity2014-20152015-20162016-20172017-20182018-2019Number of industrial facilities’ inventories inspected Part 5: Evaluation of the Stormwater Management Program This is the eighth reporting year (ninth permitted year) following issuance of the MS4 permit on August 27, 2010.