Stage Construction definition
Examples of Stage Construction in a sentence
See Attachment M, Stage Construction Concept Exhibits, for more information.
For the purpose of clarity, the parties agree that Stagehands include the positions of Technical Director, Head of Wardrobe, Head of Stage Construction (formerly Theatre Technical Production Assistant), Theatre Technicians, Production Runner, and students hired as casual helpers commonly referred to as “Stagehands” and “Wardrobe Assistants”.
According to this data, the handled freight of the No. 31 berth to the No. 36 berth completed through the Miaoling Area 2nd Stage Construction accounted for about 20% of the total freight handled in 1995 and 1996, and thus had this construction not been done, the Chinese coastal freight handling would have been impeded according to our estimations.
If it is necessary to perform some of the utility relocations simultaneously with the project construction, coordination of the phasing of utility relocations will be addressed in the Special Provisions and on the Stage Construction Plans.
Foundation Report Log of Test Borings Request for Proposals November ▇▇▇▇▇▇▇-▇▇▇▇▇▇▇ Road Brldge Santa ▇▇▇▇ County Replacement Page 4 TASK 9 Design Stage Construction: Stage construction is not anticipated for this project.
The report will include as attachments the following: 35% Plans, 22 Preliminary Stage Construction exhibit, Final Operations Report, Preliminary Hydrology/Drainage Report, 23 Advance Planning Studies, Preliminary Geotechnical Report, Advisory and Mandatory Fact Sheets, and 24 Engineer's Estimate.
As indicated in section 1.1 Project Location, the Miaoling Area 2nd Stage Construction built a total of 6 berths: a container berth (No. 31), multi-purpose berth (No. 32), cereal berth (No. 33), mooring berth (No. 34), and two lumber berths (No. 35 and No. 36).
Academic Competition 40 Choral Accompanist Class Advisors: 12 Freshman 20 Sophomore 20 Junior 40 Senior 55 Stage Construction 20 Stage Manager 10 Concert Band Director 54 Debate/UN 20 Earth Club 10 Farrago 24 FBLA 32 Humanitarian Society 32 Humanitarian – Asst.
The following bridge and structure plans are anticipated: • Plan and Elevation • General Notes • Foundation Plan and Data Sheet • Stage Construction Details • Footing Plan • Deck Plan • Typical Deck Sections • Bent Plan and Elevation • Bent Details • Miscellaneous details • Temporary work bridge/shoring details Consultant shall complete a line-by-line check of the 75% plans, specifications, and design calculations and an independent check of the quantity calculations (ODOT Class II).
Sheet CONSULTANT will update the Preliminary Transportation Management Plan Data sheet for the two (2) build alternatives based on the updated Conceptual Stage Construction Plan (Task 2.5C) and the updated project cost estimates (Task 2.14C), and the updated project schedule (Task 1.