Siltation definition
Examples of Siltation in a sentence
Siltation barriers shall be made of material in which manatees or sturgeons cannot become entangled.
Siltation barriers shall also be properly secured, and be regularly monitored to avoid the entrapment of manatees or sturgeons.
Siltation adds to determine the border of such other stressors like an assessment and farakka barrage between india and agreement with india to irrigate farms.
Siltation controls $ 27,350.00 15% Contingency and Engineering $ 4,102.50 TOTAL ESTIMATED COST: $ 31,452.50 SPECIFICATIONS: All work is to be performed according to the latest Town of Oakville Standard Drawings and Specifications.
Siltation Control $ 24,000.00 15% Contingency and Engineering $ 3,600.00 TOTAL OWNER’S ESTIMATED COST $ 27,600.00 WORK TO BE DONE: All fencing, grading, sodding, seeding, planting and pathway works as shown on the plans prepared by NAK DESIGN STRATEGIES SPECIFICATIONS: All work is to be performed according to the latest Town of Oakville Standard Drawings and Specifications and the North Oakville Urban Forest Strategic Management Plan (NOUFSMP), where applicable as of the date of the agreement.
Siltation Control $ 71,820.00 15% Contingency and Engineering $ 10,773.00 TOTAL OWNER’S ESTIMATED COST $ 82,593.00 WORK TO BE DONE: All fencing, grading, sodding, seeding, planting and pathway works as shown on the plans prepared by ▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇ SPECIFICATIONS: All work is to be performed according to the latest Town of Oakville Standard Drawings and Specifications as of the date of the agreement.
Siltation controls $ 25,000.00 15% Contingency and Engineering $ 3,750.00 TOTAL ESTIMATED COST: $ 28,750.00 WORK TO BE DONE All grading, sodding and planting, as shown on plans prepared by Cosburn Nauboris Ltd.
Siltation Control $50,000.00 15% Contingency and Engineering $ 7,500.00 TOTAL OWNER’S ESTIMATED COST $57,500.00 All fencing, grading, sodding, seeding, planting and pathway works as shown on the plans prepared by ▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇ Consultants Inc.
This submission is to include certification from the design engineer that the lot grading plan maintains the intent of the overall lot grading plan as detailed on Schedule ‘B’ Lot Grading/ Siltation and Erosion Control Plan (revision 4, dated July 16, 2018), as per plans prepared by ▇ ▇ ▇▇▇▇▇▇ Engineering Limited.
Siltation and mud buildups in the Lakes shall be removed by a qualified professional selected by the Association at such times as the Association determines is appropriate or the City of Issaquah so requires.