Signalized Intersections definition

Signalized Intersections means traffic control equipment used for the operation of traffic intersections with signals including, but not limited to detectors, poles, signal indications, conduits, wiring, controllers, cabinets, safety lights, signage, markings, striping, and TSP- related equipment (where applicable) including phase selectors, detector loops, optical receivers, and special BRT signs, phase selectors, detector loops, optical receivers, special signs, and markings.

Examples of Signalized Intersections in a sentence

  • Links and Signalized Intersections: Level of Service D, with signalized intersections operating at a critical lane volume (CLV) of 1,450 or better.

  • The treatment for Ramps, Signalized Intersections, U-Turns, Driveways, Concrete Pavement Repair, Curb, Pavement Repair, Bridge Decks, and Utilities are as indicated below.

  • City is a public agency of the State of California and is in need of professional services for the following project: Upgrade Various Signal Hardware at 224 Signalized Intersections (TC20-007) Project (hereinafter referred to as “the Project”).

  • Perform operational analysis for the following roadway components: Signalized Intersections Un-signalized Intersections Roundabouts Basic Freeway Segments Weaving Area Segments Multi-lane Highways Two-Lane Highways Arterials Present LOS results graphically.

  • To maintain all Signalized Intersections identified on Exhibit “B”, which is attached hereto and incorporated herein, subject to reimbursement for maintenance of “new” intersections by MTS or SANDAG as provided herein.

  • Perform operational analysis for the following roadway components: Signalized Intersections Un-signalized Intersections Roundabouts Basic Freeway Segments Weaving Area Segments Multi-▇▇▇▇ Highways Two-Lane Highways Arterials Present LOS results graphically.

  • To process payment for all electrical energy ▇▇▇▇▇▇▇▇ (“existing” and “new”) for Signalized Intersections listed on Exhibit “B”.

  • Task 1 Project Management $ 10,300 Task 2 Project Kick-off Meeting $ 5,000 Task 3 Self-Evaluation • Non-Facilities $ 8,100 • Facilities Review and Facility Reports o Buildings $ 4,700 o Parks $ 16,800 o Sidewalk and Unsignalized Intersection Inventory $ 2,700 o Signalized Intersections $ 2,100 o Sidewalk Corridors $ 4,200 Total Lump Sum Fee $100,000 Lump sum fees will be invoiced monthly based upon the overall percentage of services performed.

  • To maintain TSP-related equipment at “existing” Signalized Intersections as identified on Exhibit “B”.