Shutdown Date definition

Shutdown Date means the exact date for termination of the medium-power service as indicated by Buyer in accordance with Section 9.14.
Shutdown Date. The date on which any ANPP Unit is taken out of service and retired from use as a source of electric generation as determined by the Operating Agent, customarily expected to be approximately forty (40) years after such Unit is placed in commercial operation.
Shutdown Date means the first day of the ninety (90) day period giving rise to a determination that a Shutdown has occurred.

More Definitions of Shutdown Date

Shutdown Date is defined in Section 6.1(g)(i).
Shutdown Date means the first day on which the Existing VCM Plant is shut down to begin retrofitting of existing equipment, to complete the necessary tie-in of new equipment as identified in the VCM expansion design scope, and to complete normal pre-operational work prior to the Start-Up Date.

Related to Shutdown Date

  • Commissioning Date means that date when construction of the contemplated Project is complete, and the Maintenance Term commences;

  • Planned Outage means the removal of equipment from service availability for inspection and/or general overhaul of one or more major equipment groups. To qualify as a Planned Outage, the maintenance (a) must actually be conducted during the Planned Outage, and in Seller’s sole discretion must be of the type that is necessary to reliably maintain the Project, (b) cannot be reasonably conducted during Project operations, and (c) causes the generation level of the Project to be reduced by at least ten percent (10%) of the Contract Capacity.

  • Unplanned Outage refers to the unavailable status of the units of the Power Plant other than Planned Outage. Based on the urgency of the needs of outage, the Unplanned Outage can be classified into five categories: (1) immediate outage; (2) the outage which could be delayed for a short while but the units must exit within six hours; (3) the outage which could be postponed over six hours but the units must exit within seventy-two hours; (4) the outage which could be deferred over seventy-two hours but the units must exit before the next Planned Outage; and (5) the prolonged outage which is beyond the period of the Planned Outage.

  • Commissioning Period means, with respect to each Subproject, the period commencing upon the first delivery of Feed Gas to the Subproject in accordance with Sections 4.8 and 11.1 of the Agreement continuing through achievement of RFSU, commissioning, Start Up, Performance Testing and achievement of Substantial Completion for such Subproject.

  • Scheduled Commissioning Date or “SCD” of the Project shall mean [Insert Date];

  • Off-Peak Hours means those hours which are not On-Peak Hours.

  • Scheduled Completion Date shall be the date set forth in Clause 10.3;

  • Period End Date The 15th day of each calendar month, with Adjustment. Fixed Rate: [ ]%. Fixed Rate Day Count Fraction: 30/360. Floating Amounts: Floating Rate Payer: [ ]. Floating Rate Payer Payment Dates: The 15th day of each calendar month commencing on [ ], subject to adjustment in accordance with the Following Business Day Convention.

  • Billing Commencement Date means the earlier of:

  • CONTRACT END DATE Contract performance shall terminate as of December 31, 2027, with no new obligations being incurred after this date unless the Contract is properly amended, provided that the terms of this Contract and performance expectations and obligations shall survive its termination for the purpose of resolving any claim or dispute, for completing any negotiated terms and warranties, to allow any close out or transition performance, reporting, invoicing or final payments, or during any lapse between amendments. CERTIFICATIONS: Notwithstanding verbal or other representations by the parties, the “Effective Date” of this Contract or Amendment shall be the latest date that this Contract or Amendment has been executed by an authorized signatory of the Contractor, the Department, or a later Contract or Amendment Start Date specified above, subject to any required approvals. The Contractor certifies that they have accessed and reviewed all documents incorporated by reference as electronically published and the Contractor makes all certifications required under the Standard Contract Form Instructions and Contractor Certifications under the pains and penalties of perjury, and further agrees to provide any required documentation upon request to support compliance, and agrees that all terms governing performance of this Contract and doing business in Massachusetts are attached or incorporated by reference herein according to the following hierarchy of document precedence, the applicable Commonwealth Terms and Conditions, this Standard Contract Form, the Standard Contract Form Instructions and Contractor Certifications, the Request for Response (RFR) or other solicitation, the Contractor’s Response (excluding any language stricken by a Department as unacceptable, and additional negotiated terms, provided that additional negotiated terms will take precedence over the relevant terms in the RFR and the Contractor’s Response only if made using the process outlined in 801 CMR 21.07, incorporated herein, provided that any amended RFR or Response terms result in best value, lower costs, or a more cost effective Contract.

  • Scheduled Commercial Operation Date shall have the meaning ascribed to it in Clause 5.4.1;

  • Anticipated Closing Date means the anticipated closing date of any proposed Qualified Sale Transaction, as determined in good faith by the Board of Directors on the Applicable Date.

  • Excused Outage means any disruption to or unavailability of Services caused by or due to (i) Scheduled Maintenance,

  • Billing Date means the date upon which the monthly statement is generated and debited to the customer's account.

  • Target Completion Date has the meaning given such term in Section 3.3(b).

  • Wind Turbine means a mechanical/electrical system that converts the kinetic energy of blowing wind into mechanical or electric power.

  • Commercial Operation Date means the date on which a Material Project is substantially complete and commercially operable.

  • Project Completion Date means the date on which the Completion Certificate is issued;

  • Planned Downtime means any period of time during which the Service is unavailable due to Conga’s planned maintenance and support of the Service or Conga System. Planned Downtime shall not exceed 5 hours per month. Conga will endeavor to give at least 24 hours’ notice before Planned Downtime except for urgent circumstances (e.g., a system failure or security threat). Planned Downtime occurs from 10:00 p.m. Friday through 1:00 p.m. Sunday, Mountain Time.

  • Cooling Off Period means the duration of time counted from the date when the direct seller and the direct selling entity enter into an agreement and ending with the date on which the contract is to be performed and within which direct seller may repudiate the agreement without being subject to penalty for breach of contract.

  • Project Commencement Date means the commencement date notified to the Minister pursuant to clause 4(1);

  • True-Up Date means the date which is forty-five (45) days after the latest to occur of the Termination Date of this Agreement, the Termination Date of the Single Family Agreement, if applicable, or disposition of all Assets pursuant to this Agreement or the Single Family Agreement, if applicable. EXHIBIT 2.5

  • Transit Traffic means traffic originating on CLEC’s network that is switched and transported by AT&T-TSP and delivered to a Third Party Terminating Carrier’s network or traffic from a Third Party Originating Carrier’s network. A call that is originated or terminated by a CLEC purchasing local switching pursuant to a commercial agreement with AT&T-TSP is not considered Transit Traffic for the purposes of this Attachment. Additionally Transit Traffic does not include traffic to/from IXCs.

  • Plant Test Date or "PTD" means the date acceptance testing is performed with CLEC. "Point of Interface", "Point of Interconnection," or "POI" is a demarcation between the networks of two (2) LECs (including a LEC and CLEC). The POI is that point where the exchange of traffic takes place.

  • Excused Downtime means the number of minutes in the Charging Period, rounded to the nearest minute that the link state of Customer’s Port is ‘down’ due to:

  • Commercial Operations Date or "COD": The date on which Facility first achieves Commercial Operations.