Shoring plan definition

Shoring plan means a written description or drawing that shows the structural supports required to safely occupy the building during remediation.

Examples of Shoring plan in a sentence

  • List the location and number required for each type or size of bearing.• Steel girder details - framing and bracing, splices, etc.• Deck joint details - armored corners, paving dams, joint seals, etc.• Electrical and lighting details.• Signing or signal support details.• Pile details - tip reinforcement, encasement, etc.• Median details - barrier rail, longitudinal joint, etc.• Shoring plan and Falsework diagram and lighting.• Surface finish diagram.

  • Thus, if LG&E/KU were to choose to add this line later, approximately 10 years after TC2 was in operation, the net present value cost for MISO Option #3 of completing construction of the Mill Creek to Hardin County 345 kV line would be approximately $20 million more than MISO Option #4.4 Liberty estimates that the Mill Creek to Hardin County 345 kV line would have to be deferred by approximately 20 years in order for Option #3 to be more economical than Option #4.

  • Not more than will be paid for all losses sustained in any one accident.

  • Preparation: Install sheeting and shoring around abandoned oil/water separator(s) vault(s) per approved Sheeting and Shoring plan prior to structure removal to isolate excavation area and control groundwater.B. Remove gravel backfill from inside the vault, load, haul and stockpile.

  • Preparation: Install sheeting and shoring around abandoned stormwater vaults per approved Sheeting and Shoring plan prior to structure removal to isolate excavation area and control groundwater.

  • Shoring plan will define required shoring and temporary support for the work of the project.

  • The submitted Trench and Shoring plan shall detail the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of the trench.

  • Shoring plan submittals will be determined by SMUD on a case-by-case basis.

  • List the location and number required for each type or size of bearing. Steel girder details - framing and bracing, splices, etc. Deck joint details - armored corners, paving dams, joint seals, etc. Electrical and lighting details. Signing or signal support details. Pile details - tip reinforcement, encasement, etc. Median details - barrier rail, longitudinal joint, etc. Shoring plan and Falsework diagram and lighting. Surface finish diagram.

  • Submit a Sheeting and Shoring plan for approval 15 days prior to starting work.

Related to Shoring plan

  • service delivery and budget implementation plan means a detailed plan approved by the executive mayor of a municipality in terms of section 53(l)(c)(ii) of the MFMA for implementing the municipality's delivery of municipal services and its annual budget, and which must indicate

  • Mining Plan means a mining plan drawn in accordance with clause (b) of sub-section

  • Program Plan means the tobacco settlement program plan dated February 14, 2001, including exhibits to the program plan, submitted by the authority to the legislative council and the executive council, to provide the state with a secure and stable source of funding for the purposes designated by section 12E.3A and other provisions of this chapter.

  • Project Implementation Plan means the detail plan submitted by the Developer with regard to development of Project Facilities and its operation and management thereof in accordance with this Agreement and to be appended as Schedule 9 to this Agreement.

  • Training Plan means the plan that outlines what training and assessment will be conducted off-the-job and what will be conducted on-the-job and how the Registered Training Organisation will assist in ensuring the integrity of both aspects of the training and assessment process.

  • Numbering Plan Area (“NPA”) (sometimes referred to as an area code) is the three- digit indicator which is designated by the first three digits of each 10-digit telephone number within the NANP. Each NPA contains 800 possible NXX Codes. There are two general categories of NPA, “Geographic NPAs” and “Non-Geographic NPAs.” A “Geographic NPA” is associated with a defined geographic area, and all telephone numbers bearing such NPA are associated with services provided within that geographic area. A “Non-Geographic NPA,” also known as a “Service Access Code (SAC Code)” is typically associated with a specialized Telecommunications Service which may be provided across multiple geographic NPA areas; 500, 800, 900, 700, and 888 are examples of Non-Geographic NPAs.

  • Numbering Plan Area (NPA) , also called area code, means the three (3)-digit code that occupies the A, B, C positions in the ten (10)-digit NANP format that applies throughout the NANP Area. NPAs are of the form NXX, where N represents the digits two (2) through nine (9) and X represents any digit zero (0) through nine (9). In the NANP, NPAs are classified as either geographic or non-geographic. Geographic NPAs are NPAs which correspond to discrete geographic areas within the NANP Area. Non-geographic NPAs are NPAs that do not correspond to discrete geographic areas, but which are instead assigned for services with attributes, functionalities, or requirements that transcend specific geographic boundaries. For example, NPAs in the N00 format, (e.g., 800, 900) are non- geographic.

  • Constructional Plan means all appliances or things of whatsoever nature required for the execution, completion or maintenance of the works or temporary works (as hereinafter defined) but does not include materials or other things intended to form or forming part of the permanent work.

  • Marketing Plan means a plan or system concerning a material aspect of conducting business. Indicia of a marketing plan include any of the following:

  • Decommissioning Plan means the document containing detailed information on the proposed decommissioning and covering the following: the selected decommissioning strategy; the schedule, type and sequence of decommissioning activities; the waste management strategy applied, including clearance; the proposed end state; the storage and disposal of the waste from decommissioning; the timeframe for decommissioning; the cost estimates for the completion of decommissioning; and the objectives, expected results, milestones, target dates, as well as the corresponding key performance indicators, including, as appropriate, earned value based indicators. The plan is prepared by the nuclear facility license holder and is reflected in the multiannual work programmes of the Programme;

  • DWP Offshoring Policy means the Authority’s policy and procedures as advised to the Contractor by the Authority from time to time.

  • State implementation plan or “SIP” means the plan adopted by the state of Iowa and approved by the Administrator which provides for implementation, maintenance, and enforcement of such primary and secondary ambient air quality standards as they are adopted by the Administrator, pursuant to the Act.

  • Space Plan means the space plan to be prepared by Tenant in accordance with paragraph 2 below and approved by Landlord and Tenant, and showing the general configuration of the Tenant Improvements.

  • Project Implementation Manual or “PIM” means the manual setting out the measures required for the implementation of the Project, as the same may be amended from time to time, subject to prior approval of the Association;

  • Basic health plan model plan means a health plan as required in RCW 70.47.060(2)(e).

  • Flexi Plan means any individual indemnity hospital insurance plan under the VHIS framework with enhancement(s) to any or all of the protections or terms and benefits that the Standard Plan provides to the Policy Holder and the Insured Person, subject to certification by the Government. Such plan shall not contain terms and benefits which are less favourable than those in the Standard Plan, save for the exception as may be approved by the Government from time to time.

  • Implementation Plan means the schedule included in the Statement of Work setting forth the sequence of events for the performance of Services under the Statement of Work, including the Milestones and Milestone Dates.

  • Rectification Plan means the rectification plan pursuant to the Rectification Plan Process;

  • Supply Plan has the meaning set forth in the CAISO Tariff.

  • Building Plans mean the general building plans and specifications in respect of the Development or in respect of any part or parts of the Development prepared by the Authorized Person and approved by the Building Authority and includes any approved amendments thereto;

  • Web Site Accessibility Standards/Specifications means standards contained in Title 1 Texas Administrative Code Chapter 206.

  • Approved Plan means plan for the building or lay out plan approved by the Authority in accordance with prescribed regulations.

  • Functional Specifications means the descriptions of features and functions of the Application as expressly set forth in Quote.

  • layout plan means a plan of the project depicting the division or proposed division of land into plots, roads, open spaces, amenities, etc. and other details as may be necessary;

  • Redevelopment Plan means the “Lincoln Center Redevelopment Plan” passed, adopted and approved by the City pursuant to the Resolution, and shall include any amendment of said Redevelopment Plan heretofore or hereafter made by the City pursuant to law.

  • Construction Plan means a representation of a project site and all activities associated with the project. The plan includes the location of the project site, buildings and other infrastructure, grading activities, schedules for implementation, and other pertinent information related to the project site. A storm water pollution prevention plan is a part of the construction plan.