Shared Resource definition

Shared Resource has the meaning set forth in Section 5.10 (Joint Commercialization Costs Allocation).
Shared Resource means a Resource of Seller that is not a Non-Shared Resource and
Shared Resource means the joint use by both BFDS and Seller of the ARGOS System.

Examples of Shared Resource in a sentence

  • The Biorepository and Tissue Technology Shared Resource website provides additional detail about resources that are available.

  • We used the food composition database which was developed and is maintained by the Nutrition Support Shared Resource at the UH Cancer Center.

  • Such data shall be processed solely for the purposes of the performance, management and monitoring of the Contract by the Director of the Shared Resource Directorate MOVE/ENER acting as data controller without prejudice to possible transmission to the bodies charged with monitoring or inspection task in application of Union law.

  • Boundaries and Water: Allocation and Use of a Shared Resource (Summer Conference, June 5-7).

  • Mass spectrometry was carried out in the Analytical Biochemistry Shared Resource of the Masonic Cancer Center, University of Minnesota, funded in part by Cancer Center Support Grant CA-77598.

  • Data Custodian deletes Shared Resource Key, terminating the relationship.

  • The concept of a Shared Resource Key is used throughout these use cases.

  • In 2016/17 a business case was developed for delivery of IT services as a partnership with the Shared Resource Service (SRS).

  • The Northwood Shared Resource Center (NSRC) will provide the basic facilities required for a Level-3 data center as required by the new system.

  • Shared Resource Pool The following agreement was reached with regards to this topic: Agreement With regards to the SL Positioning resource allocation, for SL Positioning resource (pre-)configuration in a shared resource pool with Rel-16/17/18 sidelink communication (if supported), backward compatibility with legacy Rel-16/17 Ues should be ensured.


More Definitions of Shared Resource

Shared Resource means any employees, or if applicable, agents, subcontractors or representatives of Visteon or its Affiliates who provide any Services under this Agreement and who are obligated under law or contract to assign or license intellectual property rights to Visteon.

Related to Shared Resource

  • Landed Resources means when the Contractor or its Sub-contractor causes foreign nationals to be brought to the United Kingdom, to provide the Services.

  • Integrated resource plan or "IRP" means the filing made every two years by a utility in accordance with WAC 480-100-238 Integrated resource planning.

  • economic resources means assets of every kind, whether tangible or intangible, movable or immovable, which are not funds, but may be used to obtain funds, goods or services;

  • Limited Resource Price Decrement means, for the 2017/2018 Delivery Year, a difference between the clearing price for Limited Demand Resources and the clearing price for Extended Summer Demand Resources and Annual Resources, representing the cost to procure additional Extended Summer Demand Resources or Annual Resources out of merit order when the Limited Resource Constraint is binding.

  • Environmentally-Limited Resource means a resource which has a limit on its run hours imposed by a federal, state, or other governmental agency that will significantly limit its availability, on either a temporary or long-term basis. This includes a resource that is limited by a governmental authority to operating only during declared PJM capacity emergencies.

  • Batch Load Demand Resource means a Demand Resource that has a cyclical production process such that at most times during the process it is consuming energy, but at consistent regular intervals, ordinarily for periods of less than ten minutes, it reduces its consumption of energy for its production processes to minimal or zero megawatts.

  • Base Load Generation Resource means a Generation Capacity Resource that operates at least 90 percent of the hours that it is available to operate, as determined by the Office of the Interconnection in accordance with the PJM Manuals.

  • Historic resource means a publicly or privately owned historic building, structure, site, object, feature, or open space located within an historic district designated by the national register of historic places, the state register of historic sites, or a local unit acting under the local historic districts act, 1970 PA 169, MCL 399.201 to 399.215, or that is individually listed on the state register of historic sites or national register of historic places, and includes all of the following:

  • Net energy metering means the difference between the kilowatt-hours consumed by a customer-generator and the kilowatt-hours generated by the customer- generator's facility over any time period determined as if measured by a single meter capable of registering the flow of electricity in two directions.

  • Limited Demand Resource Reliability Target for the PJM Region or an LDA, shall mean the maximum amount of Limited Demand Resources determined by PJM to be consistent with the maintenance of reliability, stated in Unforced Capacity that shall be used to calculate the Minimum Extended Summer Demand Resource Requirement for Delivery Years through May 31, 2017 and the Limited Resource Constraint for the 2017/2018 and 2018/2019 Delivery Years for the PJM Region or such LDA. As more fully set forth in the PJM Manuals, PJM calculates the Limited Demand Resource Reliability Target by first: i) testing the effects of the ten- interruption requirement by comparing possible loads on peak days under a range of weather conditions (from the daily load forecast distributions for the Delivery Year in question) against possible generation capacity on such days under a range of conditions (using the cumulative capacity distributions employed in the Installed Reserve Margin study for the PJM Region and in the Capacity Emergency Transfer Objective study for the relevant LDAs for such Delivery Year) and, by varying the assumed amounts of DR that is committed and displaces committed generation, determines the DR penetration level at which there is a ninety percent probability that DR will not be called (based on the applicable operating reserve margin for the PJM Region and for the relevant LDAs) more than ten times over those peak days; ii) testing the six-hour duration requirement by calculating the MW difference between the highest hourly unrestricted peak load and seventh highest hourly unrestricted peak load on certain high peak load days (e.g., the annual peak, loads above the weather normalized peak, or days where load management was called) in recent years, then dividing those loads by the forecast peak for those years and averaging the result; and (iii) (for the 2016/2017 and 2017/2018 Delivery Years) testing the effects of the six-hour duration requirement by comparing possible hourly loads on peak days under a range of weather conditions (from the daily load forecast distributions for the Delivery Year in question) against possible generation capacity on such days under a range of conditions (using a Monte Carlo model of hourly capacity levels that is consistent with the capacity model employed in the Installed Reserve Margin study for the PJM Region and in the Capacity Emergency Transfer Objective study for the relevant LDAs for such Delivery Year) and, by varying the assumed amounts of DR that is committed and displaces committed generation, determines the DR penetration level at which there is a ninety percent probability that DR will not be called (based on the applicable operating reserve margin for the PJM Region and for the relevant LDAs) for more than six hours over any one or more of the tested peak days. Second, PJM adopts the lowest result from these three tests as the Limited Demand Resource Reliability Target. The Limited Demand Resource Reliability Target shall be expressed as a percentage of the forecasted peak load of the PJM Region or such LDA and is converted to Unforced Capacity by multiplying [the reliability target percentage] times [the Forecast Pool Requirement] times [the DR Factor] times [the forecasted peak load of the PJM Region or such LDA, reduced by the amount of load served under the FRR Alternative].

  • energy service provider means a natural or legal person who delivers energy services or other energy efficiency improvement measures in a final customer’s facility or premises;

  • Limited Resource Constraint means, for the 2017/2018 Delivery Year and for FRR Capacity Plans the 2017/2018 and Delivery Years, for the PJM Region or each LDA for which the Office of the Interconnection is required under Tariff, Attachment DD, section 5.10(a) to establish a separate VRR Curve for a Delivery Year, a limit on the total amount of Unforced Capacity that can be committed as Limited Demand Resources for the 2017/2018 Delivery Year in the PJM Region or in such LDA, calculated as the Limited Demand Resource Reliability Target for the PJM Region or such LDA, respectively, minus the Short Term Resource Procurement Target for the PJM Region or such LDA, respectively.

  • Individualized family service plan means a written plan for providing early intervention services to an eligible child and the child’s family.

  • Critical Energy Infrastructure Information means all information, whether furnished before or after the mutual execution of this Agreement, whether oral, written or recorded/electronic, and regardless of the manner in which it is furnished, that is marked “CEII” or “Critical Energy Infrastructure Information” or which under all of the circumstances should be treated as such in accordance with the definition of CEII in 18 C.F.R. § 388.13(c)(1). The Receiving Party shall maintain all CEII in a secure place. The Receiving Party shall treat CEII received under this agreement in accordance with its own procedures for protecting CEII and shall not disclose CEII to anyone except its Authorized Representatives.

  • Energy Storage Resource means a resource capable of receiving electric energy from the grid and storing it for later injection to the grid that participates in the PJM Energy, Capacity and/or Ancillary Services markets as a Market Participant. Facilities Study:

  • Interconnected Reliability Operating Limit or “IROL” shall mean the value (such as MW, MVAR, Amperes, Frequency, or Volts) derived from, or a subset of, the System Operating Limits, which if exceeded, could expose a widespread area of the bulk electrical system to instability, uncontrolled separation(s) or cascading outages.

  • BPO Services means Provider’s business process outsourcing services described in the applicable Solution Exhibit, whereby Provider assumes responsibility for Customers’ business processes.

  • Renewable energy resources means resources as defined

  • renewable energy sources means renewable sources such as small hydro, wind, solar including its integration with combined cycle, biomass, bio fuel cogeneration, urban or municipal waste and other such sources as approved by the MNRE;

  • Imbalance Energy means the amount of Energy, in any given settlement period, by which the amount of Delivered Energy deviates from the amount of Scheduled Energy.

  • Renewable energy project means (A) a project

  • Water resources means all waters of the state occurring on the surface, in natural or artificial channels, lakes, reservoirs, or impoundments, and in subsurface aquifers, which are available, or which may be made available to agricultural, industrial, commercial, recreational, public, and domestic users;

  • System Services has the meaning given such term in Section 3.1.

  • Performance Monitoring System has the meaning given to it in paragraph 1.1.2 in Part B of Schedule 6 (Service Levels, Service Credits and Performance Monitoring);

  • water services means water supply services and sanitation services;

  • Information Resources means any and all computer printouts, online display devices, mass storage media, and all computer-related activities involving any device capable of receiving email, browsing Web sites, or otherwise capable of receiving, storing, managing, or transmitting Data including, but not limited to, mainframes, servers, Network Infrastructure, personal computers, notebook computers, hand-held computers, personal digital assistant (PDA), pagers, distributed processing systems, network attached and computer controlled medical and laboratory equipment (i.e. embedded technology), telecommunication resources, network environments, telephones, fax machines, printers and service bureaus. Additionally, it is the procedures, equipment, facilities, software, and Data that are designed, built, operated, and maintained to create, collect, record, process, store, retrieve, display, and transmit information.