SFAR definition

SFAR. Means the E-SAT Communication System Final Acceptance Review which happens after the completion of the E-SAT Communication System Preliminary Acceptance Review and Final Acceptance Tests as defined in Article 7 (Inspection and Acceptance).

Examples of SFAR in a sentence

  • The SFAR is given by ln S ln A C 4 8 16 32 64 128 256 512 1024 50 100 0 150 ln S 00 S = SARðAÞPðλÞ = cAz expð−b=λÞ: [1] In log-log space, the model is linear: log S = log c + z log A − bλ−1: [2] This model fits the simulated data in Fig.

  • The customer is not allowed to travel abroad with premium cars (PFAR, PDAR, PDAE, FFAR, SFAR, FFAI car group) and commercial vehicles (EKMR, EPMR, CKMR, DKMR.

  • We calculated the corrected ▇▇▇▇▇▇’▇ information criterion (AICc) for the two models, con- firming that SFAR with the extra parameter b clearly outper- forms SAR (Fig.

  • For water delivered to the El Dorado Parties at the SFAR Delivery Point, the El Dorado Parties will pay to SMUD the sum of the Annual Surcharge for deliveries from Seasonal Storage plus the Annual Surcharge for deliveries from Carryover Storage in proportion to the deliveries made, as provided in Exhibit “F”.

  • Deliveries at the SFAR Delivery Point will not be metered or otherwise measured, but will be deemed to have been delivered pursuant to the then-effective schedule of the El Dorado Parties.

  • Annual Deliveries and deliveries from Carryover Storage will be made at the White Rock Delivery Point as further specified in Section 5.2.2.3 or the SFAR Delivery Point.

  • For all water delivered to the El Dorado Parties at the White Rock Delivery Point or the SFAR Delivery Point during the last quarter of each calendar year, a surcharge will be assessed to cover SMUD’s costs of providing Seasonal Storage to the El Dorado Parties.

  • This surcharge will be a function of the Daily Power Index, the respective Cumulative Powerhouse Water Duty, the daily quantities of water delivered at the White Rock Delivery Point and the SFAR Delivery Point expressed in acre-feet, and a factor to cover ISO fees, calculated using the formula and values specified in Exhibit “F”.

  • Such final reporting shall contain the allocation of all deliveries metered at the White Rock Meter and scheduled at the SFAR Delivery Point.

  • The El Dorado Parties may re-open this Agreement if the El Dorado Parties desire to add points of delivery (other than the White Rock Delivery Point, the SFAR Delivery Point, and at the Iowa Hill Development) within the UARP.