SDEC definition
Examples of SDEC in a sentence
Six months before the Project expressway opens, SPG shall cause SPCD through SDEC to seek ADB’s concurrence on the proposed toll structure and levels before seeking SPG approval.
SPG through SPCD shall cause SDEC to install vehicle axle-weighing equipment at selected entry points and make suitable arrangements for the operation of such equipment.
SPG shall cause SPCD through SDEC to seek ADB’s concurrence on toll level adjustment before seeking SPG approval.
SPG through SPCD shall, or shall cause SDEC to, furnish, to ADB, promptly after their preparation, such plans, design standards, specifications and work schedules, and any material modifications subsequently made therein, in such detail as ADB shall reasonably request.
Dalenia diverged and originated in Borneo (area F; RP = 0.95, MP = 1.0), followed by Diplectria with two possibilities as ancestral areas, Sumatra (D) or Sumatra-Borneo (DF) based on S-DEC (RP= 0.37) and Sumatra-Borneo (DF) or Malay Peninsula-Borneo (CF) based on S-DIVA (MP= 0.50).
Parties shall address correspondence to: With a copy to: Site Number: 224042 Office of General Counsel NY SDEC ▇▇▇ ▇▇▇▇▇▇▇▇ Albany New York 12233-5500 Site Control Section Division of Environmental Remediation NY SDEC ▇▇▇ ▇▇▇▇▇▇▇▇ Albany, NY 12233 All notices and correspondence shall be delivered by hand, by registered mail or by Certified mail and return receipt requested.
In the event that (a) any change in ownership of the Project facilities, or (b) any sale, transfer or assignment of SPG’s or SPCD’s shares or interest, or SDEC’s interest in the Project expressway is anticipated, the Borrower and SPG through SCD shall, and shall ensure that SDEC, consult with ADB at least six months prior to implementation of such change.
The S-DEC analysis estimated the origin of the section to be on Sumatra (D), followed by several dispersal events to the Malay Peninsula and Borneo during the late Miocene to Pliocene (these latter two areas were optimised as the area of origin by S-DIVA) (Table 7-3).
Whenever notice to the Grantee (other than the annual certification) or approval from the Grantee is required, the Party providing such notice or seeking such approval shall identify the Controlled Property by referencing the following in formation: County, NY SDEC Site Number, NY SDEC ▇▇▇▇▇▇▇▇▇▇ Cleanup Agreement State Assistance Contract or Order Number, and the County tax map number or the Liber and Page or computerized system identification number.
Sphera SD/EC collection is Forbo's homogeneous vinyl flooring with conductive properties in sheet format.