Scenario B definition

Scenario B means that Seller assumes the load obligation(s) at the CL&P Metering Domains. CL&P will reimburse Seller for the Locational Price Differential. CL&P will be entitled to all ARR proceeds associated with Seller’s percentage of the applicable Standard Service Loads and/or LRS Loads.
Scenario B. The Consolidated Company’s Trailing Twelve Month’s Earnings is $40,000,000 as of the First Vesting Date, $50,000,000 as of the Second Vesting Date and $60,000,000 as of the Third Vesting Date. The resulting Performance Ratio at each Vesting Date is: First Vesting Date: $40,000,000 / $50,000,000 = 0.8 Second Vesting Date: $50,000,000 / $50,000,000 = 1.0 Third Vesting Date: $60,000,000 / $50,000,000 = 1.2 (deemed to be 1.0) Analysis is similar to Scenario A, however Section 2.2 will not be applied until the Third Vesting Date. At the Third Vesting Date, $10,000,000 of the Trailing Twelve Month’s Earnings of the Consolidated Company for the Third Vesting Date would be applied to the Trailing Twelve Month’s Earnings of the Consolidated Company for the First Vesting Date, as follows: Excess of Trailing Twelve Month’s Earnings over $50,000,000: $60,000,000 - $50,000,000 = $10,000,000 Excess applied to First Vesting Date’s Trailing Twelve Month’s Earnings $40,000,000 + $10,000,000 = $50,000,000 Calculation of Catch-Up Ratio $50,000,000 / $50,000,000 = 1.0 Resulting in a Catch-Up Ratio applicable to the First Vesting Date of 1.0. Therefore, after applying Section 2.2, at the Third Vesting Date, the portion of Shares that did not vest at the First Vesting Date (20.0% of one third) will be fully vested and 100.0% of one third of the Shares will have vested at each of the Second and Third Vesting Date (subject, in the case of the Third Vesting Date, to final vesting of one third of the Shares on the Final Vesting Date).
Scenario B. With respect to the “Other Assignment,”if the operator can’t work that “Other Assignmenats ”well but provides at least 60 minutes notice of his/her inability to work the “Other Assignmenbutt t”hen works yet another assignment in the same day, the operator will be assessed one “Operator Late Arrival”(OLA) for the calendar day.

Examples of Scenario B in a sentence

  • Observation 5 Good link adaptation algorithm is sufficient to cope with occasional interference in 60 GHz band Observation 6 In outdoor Scenario B, operating with LBT degrade the performance in terms of DL and UL throughput, as compared with operating without LBT.

  • As illustrated under Scenario B in the tables above, such purchase of Shares will have the effect of reducing the working capital and net tangible assets of the Company and of the Group by the dollar value of the Shares purchased.

  • Observation 3: For Scenario B + Bi-directional deployment, L1-RSRP measurement delay may cause deep drop of SNR when UE is moving into target RRH’s beam after passing source RRH.

  • Observation 2: For Scenario B + Uni-directional deployment, L1-RSRP measurement delay may cause deep drop of SNR especially when UE moves towards boresight of RRH’s panels.

  • R4-2113214 ZTE Corporation Discussion on RX beam number for HST FR2 Proposal 1: Only 1 RX beam per CPE panel is enough for Scenario B uni-directional deployment.

  • Observation 1: The known TCI state condition may not be satisfied especially for Scenario A bi-directional, Scenario B bi-directional RRH deployments.

  • Proposal 2: For Scenario B bi-directional deployment, wait for the detailed schemes determined in Channel and Scenario sessions.

  • Scenario B: You plan to forward the legal advice received from DLA Piper to your colleague in Country B.

  • Observation 1: In Scenario B, the number of Rx beam can be > 1 in unidirectional deployment, and >2 in bi-directional deployment.

  • This Agreement shall be governed by, and construed and enforced in accordance with, the laws of the State of Ohio without regard to its conflicts of laws rules.


More Definitions of Scenario B

Scenario B. The parties sign an agreement of sale which contains a suspensive condition. The suspensive condition lapses. In this scenario the agreement is void, and incapable of being revived as per Scenario A. The solution would be the same as Scenario A.
Scenario B. All initial values are 1 and the processes in P ∪ ∪ are inactive. The messages sent from R Q to R Q are delivered in time 1. By t-resiliency, processes in R reach a decision (1 by validity) within a certain time, noted TB. To take this decision, every node j of R followed a path j x x , ..., x x , x x where x x ∈ Sbd and s .dec = 1 B Proof of Correctness of Polygraph‌ In this section, we provide the complete proofs that the binary consensus protocol presented in Section 5 is a correct, ac- countable Byzantine agreement protocol. First, in Section B.1, we focus on the properties satisfied by the accountable BV- Broadcast algorithm. Then we return to show the correctness of the consensus algorithm, as well as prove that it ensures accountability.
Scenario B means the situation where the Tenderer either owns the Aircraft on the date of its Tender or is the Aircraft Manufacturer and the manufacturing process of the Aircraft is still to be completed at the date of the relevant Tender. Seller means the winning Tenderer with whom the Purchaser enters into the Agreement within the context of this Tender Procedure.

Related to Scenario B

  • Sound level meter means an instrument which includes a microphone, amplifier, RMS detector, integrator or time averager, output meter, and weighting networks used to measure sound pressure levels.

  • Treatability study means a study in which a hazardous waste is subjected to a treatment process to determine: (1) Whether the waste is amenable to the treatment process, (2) what pretreatment (if any) is required, (3) the optimal process conditions needed to achieve the desired treatment, (4) the efficiency of a treatment process for a specific waste or wastes, or (5) the characteristics and volumes of residuals from a particular treatment process. Also included in this definition for the purpose of the § 261.4 (e) and (f) exemptions are liner compatibility, corrosion, and other material compatibility studies and toxicological and health effects studies. A “treatability study” is not a means to commercially treat or dispose of hazardous waste.

  • Instantaneous flow measurement means the flow measured during the minimum time required for the flow-measuring device or method to produce a result in that instance. To the extent practical, instantaneous flow measurements coincide with the collection of any grab samples required for the same sampling period so that together the samples and flow are representative of the discharge during that sampling period.

  • Broadband level means all positions sufficiently similar in knowledge, skills, and abilities, and sufficiently similar as to kind or subject matter of work, level of difficulty or responsibilities, and qualification requirements of the work, to warrant the same treatment as to title, pay band, and other personnel transactions.

  • Single Phase Aerosol Air Freshener means an aerosol air freshener with the liquid contents in a single homogeneous phase and which does not require that the product container be shaken before use.

  • Energy efficiency measure means equipment, devices, or materials intended to decrease energy consumption, including, but not limited to, upgrades to a building envelope such as insulation and glazing; improvements in heating, ventilating and cooling systems; automated energy control systems; improved lighting, including daylighting; energy‑recovery systems; combined heat and power systems; or another utility cost‑savings measure approved by the governing body.

  • Supportive measures means individualized services that are offered to the complainant or the respondent designed to restore or preserve equal access to the District’s education program or activity without unreasonably burdening the other party. The supportive measures must be non-disciplinary and non-punitive in nature; offered before or after the filing of a formal complaint or where no formal complaint has been filed; and offered to either party as appropriate, as reasonably available, and without fee or charge. Examples of supportive measures include, but are not limited to: measures designed to protect the safety of all parties or the District’s educational environment, or deter sexual harassment; counseling; extensions of deadlines or other course-related adjustments; modifications of work or class schedules; campus escort services; mutual restrictions on contact between the parties; changes in work or class locations; leaves of absence; and increased security and monitoring of certain areas of the campus.

  • True vapor pressure means the equilibrium partial pressure exerted by a petroleum liquid as determined in accordance with methods described in American Petroleum Institute (API) Bulletin 2517, Evaporation Loss from External Floating Roof Tanks, 1980. The API procedure may not be applicable to some high viscosity or high pour crudes. Available estimates of true vapor pressure may be used in special cases such as these.

  • Scaling as used herein, involves:

  • Reference evapotranspiration or “ETo” means a standard measurement of environmental parameters which affect the water use of plants. ETo is given expressed in inches per day, month, or year as represented in Appendix C of these Guidelines, and is an estimate of the evapotranspiration of a large field of four to seven-inch tall, cool-season grass that is well watered. Reference evapotranspiration is used as the basis of determining the Maximum Applied Water Allowances.

  • Backpressure means a pressure (caused by a pump, elevated tank or piping, boiler, or other means) on the consumer's side of the service connection that is greater than the pressure provided by the public water system and which may cause backflow.

  • Barrier Level means the Barrier Level as specified in § 1 of the Product and Underlying Data.

  • Process weight means the total weight of all materials introduced into any source operation. Solid fuels charged will be considered as part of the process weight, but liquid and gaseous fuels and combustion air will not.

  • Penetration Testing means security testing in which assessors mimic real-world attacks to identify methods for circumventing the security features of an application, system, or network. (NIST SP 800-115)

  • Baseline means the “Initial Small Business Lending Baseline” set forth on the Initial Supplemental Report (as defined in the Definitive Agreement), subject to adjustment pursuant to Section 3(a).

  • Ground Level means the level of the referred point of exposed surface of the ground as indicated in the drawing.

  • Predictive emissions monitoring system or "PEMS" means all of the equipment necessary to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, O2 or CO2 concentrations), and calculate and record the mass emissions rate (for example, pounds per hour) on a continuous basis.

  • Disinfection profile means a summary of Giardia lamblia inactivation through the treatment plant.

  • Open type traction battery means a type of battery requiring liquid and generating hydrogen gas released to the atmosphere.

  • Cannabis testing facility means an entity registered by

  • Penetrant means a lubricant designed and labeled primarily to loosen metal parts that have bonded together due to rusting, oxidation, or other causes. “Penetrant” does not include “Multi-purpose Lubricants” that claim to have penetrating qualities, but are not labeled primarily to loosen bonded parts.

  • Corrective Measure The contractor shall repair and deficiencies which do not meet the performance guideline.

  • Protective Measures means appropriate technical and organisational measures which may include: pseudonymising and encrypting Personal Data, ensuring confidentiality, integrity, availability and resilience of systems and services, ensuring that availability of and access to Personal Data can be restored in a timely manner after an incident, and regularly assessing and evaluating the effectiveness of the such measures adopted by it.

  • Severity Level means the actual impact of a Defect on a user’s operational environment as further described in the table below.

  • COVID-19 Measures means any quarantine, “shelter in place,” “stay at home,” workforce reduction, social distancing, shut down, closure, sequester or any other Law, directive, guidelines or recommendations by any Governmental Authority (including the Centers for Disease Control and the World Health Organization) in each case in connection with, related to or in response to COVID-19, including the Coronavirus Aid, Relief, and Economic Security Act (CARES) or any changes thereto.

  • Peak tube potential means the maximum value of the potential difference across the x-ray tube during an exposure.