Rough Order of Magnitude definition
Examples of Rough Order of Magnitude in a sentence
Services will consist of assistance with signage/wayfinding projects, from concept development to final completion; review of Aviation Authority signage design guidelines; quality control for signage/wayfinding projects; field observations and signage/ wayfinding design recommendations; preparation of Rough Order of Magnitude (ROM) cost estimates to establish project budgets, and other related services.
The assessment will be classified as a Level 5 Rough Order of Magnitude study, in accordance with the Arup Estimate Classification Matrix.
Develop a Rough Order of Magnitude cost estimate of the project areas outlined above based on drawings and narratives provided in the Concept Plan.
Sleeves already installed across the proposed road that is to serve library ****************************************************************************** CE#117 RFI#123: RFI-123 - Electrical - Power/Data to andLocation of BAS Panels $2,723.00 ▇▇▇▇▇▇▇▇ Commercial Electric $227.00 Flintco Markup Estimated Rough Order of Magnitude.
Rough Order of Magnitude (ROM) Performance Estimate, which includes the Offeror’s total estimated ROM cost of the project with fee rate specified, the estimated period of performance, labor skill mix with the estimate of hours to complete the task and all other cost factors, i.e. materials, subcontracts, etc.
At the request of the Lottery, Z Squared has provided a Rough Order of Magnitude (ROM), which is an estimate of the efforts and costs involved in completing the Project with inclusion of the physical security requirements.
Rough Order of Magnitude (ROM) – An estimate of the level of effort required to accomplish a configuration change or a project or task(s) based on minimal available data.
A Rough Order of Magnitude (ROM) will also be compiled during this phase of the design process.
ROM – A Rough Order of Magnitude estimate (ROM estimate) is an estimation of a project’s level of effort and cost to complete.
Proposals shall include, at a minimum, a technical discussion of the proposed approach, the methodology for obtaining the results of the proposed approach, the benefits to the CWB, a Rough Order of Magnitude (ROM) of the projected price for FAT, and the potential impact on the CWB unit price.