Responsible Engineer definition
Examples of Responsible Engineer in a sentence
The Responsible Engineer will be the engineer of record in accordance with applicable state laws and regulations.
All Released-for-Construction Design, Final Design, and Record Drawings shall be signed and stamped/sealed by the appropriate Responsible Engineer and shall include, on the title sheet for the plans, the certification signatures of the Lead Engineer and the DQAM (the title sheet can be formatted to cite the appropriate certification requirements of Sections 3.2.4 and 3.12.3).
The Responsible Engineer has signed all drawings prepared under their direction.
The Responsible Engineer and any specialists with significant input to the design or Design Review shall be present.
For those drawings and documents included in the Submittal that are prepared by a manufacturer or Supplier or other persons not under the direct supervision of the Responsible Engineer, the Responsible Engineer shall affix a stamp that indicates the design shown on the sheet or Design Document conforms to the overall design and requirements of the PPA Documents.
During this period, reviewers are encouraged to contact or meet with the Responsible Engineer to gain further understanding of the design intent of discuss the reviewers issues.
Any proposed changes shall be reviewed and approved by the Responsible Engineer who produced the original Work.
The Contractor shall provide the Responsible Engineer and/or their representatives with access to the following: • regularly scheduled status meetings and schedules • engineering and technical meetings and reviews • risk management workshops and meetings • audit processes and procedures • test readiness reviews, dry runs and formal test conduct The Subcontracts Administrator shall be responsible for all contractual direction under this Contract.
Phase 1 shall consist of informal, brief presentations (sometimes known as over-the- shoulder reviews) during the development of design at the review office by the Responsible Engineer of the Design Unit being reviewed and the other Developer staff.
If the Contractor fails to make payment for the subcontractor’s portion of the work within the time frame specified herein, the subcontractor shall contact the Responsible Engineer and the Contractor’s bonding company in writing.