RE Project definition

RE Project means Solar PV Project or Wind Power Project or Wind-Solar Hybrid Power Project
RE Project or “Project” or “Project Capacity” shall mean the renewable energy generation facility of Capacity of ………..[Insert capacity as per RTC Configuration, separately for Wind and Solar] MW, located at ……………….[Insert names of Village(s), Tehsil(s), District(s) and State(s)] comprising wind and/or solar power generating systems , for supply of RE power, including ESS, if any, complemented / balanced with Power from any other source(s) as detailed under Appendix-A, having single or multiple point(s) of injection into the grid at Interconnection/ Delivery/ Metering Point, or in case of sharing of transmission lines, by separate injection at Pooling Point and having separate control system, metering, and single or multiple point(s) of injection into the grid at Delivery/Interconnection/Metering point at ISTS substation or in case of sharing of transmission lines, by separate injection at pooling point.. This includes all units and auxiliaries such as water supply, treatment or storage facilities; bay/s for transmission system in the switchyard, dedicated transmission line up to the Delivery Point and all the other assets, buildings/structures, equipment, plant and machinery, facilities and related assets required for the efficient and economic operation of the power generation facility; whether completed or at any stage of development and construction or intended to be developed and constructed for the purpose of supply of power as per this Agreement. It may be noted that the sources of generation and ESS, if any, may be co-located, or may be located at different locations, to be considered a single Project. However, it is clarified that ESS charged using a source other than RE power would not qualify as RE power. Further, the ESS offered with a Project should only be charged from RE power capacity. For avoidance of any doubt, ESS offered as a part of RE Project should be charged with RE power capacity. The same RE power shall either be considered for getting compensation in case of curtailment or for charging of ESS. In case of power being injected from the ESS (whether co-located with RE component or not), ISTS charges and losses beyond the Delivery Point, if any, will be borne by the Discom(s). It must be noted that in case the ESS is charged from non- RE power, such ESS will be construed to be the non-RE component. ESS other than aforementioned ESS could be charged with RE / Non- RE power subject to provisions of this Agreement and other applicable laws and regu...
RE Project or “Project” shall mean the renewable energy generation facility of Capacity of ………..[Insert capacity as per the committed Installed Capacity, separately for Wind, Solar PV, any other renewable energy generating source and ESS components] MW, located at [Insert names of Village(s), Tehsil(s), District(s) and State(s)] comprising RE power generating systems or a combination thereof, for supply of RE power, including ESS, if any (which may be leased/tied-up from a third-party), having single or multiple point(s) of injection into the grid at Interconnection/ Delivery/ Metering Point, or in case of sharing of transmission lines, by separate injection at Pooling Point and having separate control systems and metering, The Project shall include all units and auxiliaries such as water supply, treatment or storage facilities; bay/s for transmission system in the switchyard, dedicated transmission line up to the Delivery Point and all the other assets, buildings/structures, equipment, plant and machinery, facilities and related assets required for the efficient and economic operation of the power generation facility; whether completed or at any stage of development and construction or intended to be developed and constructed for the purpose of supply of power as per this Agreement. It may be noted that the sources of generation and ESS, may be co- located, or may be located at different locations, to be considered a single Project. However, it is clarified that ESS charged using a source other than RE power would not qualify as RE power. In case the ESS component is located separately from the RE power generating components of a Project, the charges for charging the ESS will be borne by the RPD under GNA regulations and other orders issued by MoP/CERC in this regard. It is clarified that arithmetic summation of the rated capacities of Wind, Solar PV and other renewable power generating components of the Project can be more than the Contracted Capacity.

Examples of RE Project in a sentence

  • In anticipation of the commencement of the main construction works for the GNSR Expressway R&E Project, GNSR Company has undertaken the standardized tender and bidding process through the Guangzhou Public Resources Trading Center and on 17 October 2023 (after trading hours), issued the letters of award to the respective Contractors (being the winning bidders for each of the tenders) for the main construction works under the GNSR Expressway R&E Project.

  • Furthermore, in connection with the commencement of the main construction works for the GNSR Expressway R&E Project, GNSR Company has also undertaken the standardized tender and bidding process and on 17 October 2023 (after trading hours), issued a letter of award to the winning bidder, namely Chengxin S&C, for supervisory works for the construction works under the GNSR Expressway R&E Project.

  • Reference is made to the announcements of the Company dated 17 October 2022, 28 November 2022, 10 January 2023, 28 February 2023 and 20 March 2023 and the circular of the Company dated 22 December 2022 regarding the Land Expropriation Agreements and the Preliminary Construction Works Agreement for the GNSR Expressway R&E Project.

  • Based on the construction plan and design for the main construction works as approved by the Department of Transport of Guangdong Province in September 2023, the total length of the GNSR Expressway R&E Project is approximately 38.3km, with construction standards set at a two-way, ten- to twelve-lane expressway with a design speed of 100km/h.

  • By undertaking the GNSR Expressway R&E Project, it is expected that the asset quality of GNSR Expressway will be effectively improved, the remaining concession period may be extended, the scale of the Company’s expressway assets will be expanded, the Company’s future development capacity of its principal toll road business will be enhanced, and the Company’s core advantages in the investment, construction, operation and management of toll roads may be strengthened.

  • Upon execution of the Preliminary Construction Works Agreement in November 2022, the construction works for the preliminary works portion of the GNSR Expressway R&E Project has commenced.

  • It is anticipated that the Group may enter into further transactions contemplated under the GNSR Expressway R&E Project with different parties.

  • Based on the latest plan, the major works of the GNSR Expressway R&E Project are expected to complete, and therefore the GNSR Expressway R&E Project is expected to open to traffic, within 2028.

  • Furthermore, upon the execution of the Land Expropriation Agreements in early 2023, land expropriation works for the GNSR Expressway R&E Project have been under way and certain land has been expropriated and are expected to be delivered shortly after the land use approval of the Ministry of Natural Resources (which is expected to be obtained within 2023), and such land will be used for the reconstruction and expansion works.

  • As such, the GNSR Company intends to commence the major construction works, which are necessary and integral to the GNSR Expressway R&E Project.


More Definitions of RE Project

RE Project means the Renewable Energy power project / Generating Systems with Energy Storage Systems (ESS), as the case may be. It is clarified that ESS charged using a source other than RE power would not qualify as RE;
RE Project for the purpose of this tender shall mean Wind-Solar Hybrid Power Project or system of combined generation / blending of Wind and Solar Projects in a single PPA”
RE Project or “Project” or “Project Capacity” shall mean as defined in SECI-RPD PPA.

Related to RE Project

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Solar PV Project means the solar Photo Voltaic Power project that uses sunlight for direct conversion into electricity through Photo Voltaic technology.

  • The Project Site, where applicable, means the place or places named in the SCC.

  • Development Project means a project for the development of land within a project area.