RAB drilling definition

RAB drilling means the drilling technique in which a sample is returned to surface outside the rod string by compressed air. The drill sample may be subject to some degree of contamination.
RAB drilling means the drilling technique in which a sample is returned to surface outside the rod string by compressed air. Sample quality is poor.
RAB drilling means the drilling technique in which a sample is returned to surface outside the rod string by compressed air.

Examples of RAB drilling in a sentence

  • A Master’s decision to rusticate is separate from the decision to bring charges under the Code.

  • Percussion Rotary Air Blast (RAB) drilling may be carried out for pre-collaring of diamond drill boreholes or for obtaining samples if significant depth of cover is encountered over particular targets.

  • The RAB drilling was considered largely ineffective as the drilling terminated in a highly weathered part of the profile which was potentially gold depleted.• The two historical soil geochemistry programs together delineated a distinct zone of anomalous gold geochemistry within the western portion of the current project area.

  • Exploration comprised gridding, geochemical soil sampling, interpretation of aeromagnetic data and reconnaissance RAB drilling.

  • These prospects have significant gold anomalies at surface identified by previous soil-sampling, rock-chip sampling and RAB drilling programmes.

  • Auger soil sampling and RAB drilling planned on the Dundas Project will be designed to test both the gold potential of the greenstone belts and the lithium potential of the pegmatites.

  • The RAB drilling included seven shallow holes at two priority Airstrip targets.

  • On the 24th February 2012 the Company announced that the RAB drilling program at Jutson Rocks was expanded to follow up the gold anomalies defined to date.No other matters or circumstances have arisen since the end of the financial period which significantly affected or may significantly affect the operations of the Group, the results of those operations, or the state of affairs of the Group in future financial years.

  • RAB drilling is open hole while AC drilling uses a face sampling blade.

  • The geochemical response, positive results from RAB drilling and the presence of numerous old workings make Livingstone’s Find a third priority area for Kingston’s exploration.


More Definitions of RAB drilling

RAB drilling means Rotary Air Blast drilling;
RAB drilling means the drilling technique in which a sample is returned to sur face outside the rod string by compressed air.

Related to RAB drilling

  • drilling means the act of boring a hole to reach a proposed bottom hole location through which oil or gas may be produced if encountered in paying quantities, and includes redrilling, sidetracking, deepening, or other means necessary to reach the proposed bottom hole location, testing, logging, plugging, and other operations necessary and incidental to the actual boring of the hole;

  • borehole means a hole sunk into the earth for the purpose of locating, abstracting or using subterranean water and includes a spring;

  • Drywell means an unlined or partially lined underground pit (regardless of geometry) into which drainage from roofs, basement floors, water softeners or other non-wastewater sources is discharged and from which the liquid seeps into the surrounding soil.

  • Deep well means a well located and constructed in such a manner that there is a continuous layer of low permeability soil or rock at least 5 feet thick located at least 25 feet below the normal ground surface and above the aquifer from which water is to be drawn.

  • plantation means any land used for the growing and harvesting of crops;

  • Dewatering means the removal of water for construction activity. It can be a discharge of appropriated surface or groundwater to dry and/or solidify a construction site. It may require Minnesota Department of Natural Resources permits to be appropriated and if contaminated may require other MPCA permits to be discharged.

  • foreshore , in relation to a port, means the area between the high-water mark and the low-water mark relating to that port;

  • Pond means a natural or man-made impoundment of water with a water surface area of one acre or less at the high water level.

  • Horizontal well means a well bore drilled laterally at an angle of at least eighty (80) degrees to the vertical or with a horizontal projection exceeding one hundred (100) feet measured from the initial point of penetration into the productive formation through the terminus of the lateral in the same common source of supply.

  • Oil well means any well capable of producing oil or oil and casinghead gas from a common source of supply as determined by the commission.

  • Production company means a person or entity engaged in the business of making motion picture, television, or radio images for theatrical, commercial, advertising, or education purposes; Reserved

  • Exploration means all activities directed toward ascertaining the existence, location, quantity, quality or commercial value of deposits of Products.

  • Drilling operations means the drilling of an oil and gas well and the production and completion operations ensuing from the drilling which require entry upon the surface estate and which were commenced after June 30, 1979, and oil and gas geophysical and seismograph exploration activities commenced after June 30, 1983.

  • Intake means “Sanctioned Intake”.

  • Holocene means the most recent epoch of the Quaternary period, extending from the end of the Pleistocene Epoch to the present.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Brewery means a commercial enterprise at a single location producing more than fifty thousand (50,000) barrels per year of malt beverage;

  • Cropland means land used for the production of adapted crops for harvest, alone or in a rotation with grasses and legumes, and includes row crops, small grain crops, hay crops, nursery crops, orchard crops, and other similar specialty crops.

  • Drilling unit means the area fixed for the drilling of one well by order or rule of any state or federal body having authority. If a Drilling Unit is not fixed by any such rule or order, a Drilling Unit shall be the drilling unit as established by the pattern of drilling in the Contract Area unless fixed by express agreement of the Drilling Parties.

  • Workover means operations on a producing well to restore or increase production.

  • Junkyard means an establishment or place of business which is maintained, operated or used for storing, keeping, buying or selling junk, or for the maintenance or operation of an automobile graveyard, including garbage dumps and sanitary fills.

  • Roomer means a person occupying a dwelling unit that lacks a major bathroom or kitchen facility, in a structure where one or more major facilities are used in common by occupants of the dwelling unit and other dwelling units. Major facility in the case of a bathroom means toilet, or either a bath or shower, and in the case of a kitchen means refrigerator, stove or sink.

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • Transportation network company driver or “driver” means an

  • Qard means a contract of lending money whereby the borrower is obliged to repay the equivalent amount to lender.

  • Waterworks or “water system” means all structures, conduits and appurtenances by means of which water is delivered to consumers except piping and fixtures inside buildings served, and service pipes from building to street main.