Quay crane definition

Quay crane. ’ or ‘‘ship-to-shore crane’’ means a crane used at the berth for loading and discharging of cargo, in particular, container, that is restricted in movement by gantry rails and cables; types of ‘‘quay cranes’’ include ‘‘panamax cranes,’’ ‘‘post-panamax cranes’’ and ‘‘super post-panamax cranes’’ that can handle up to 13, 18 and above 22 rows of containers, respectively.

Examples of Quay crane in a sentence

  • Quay crane productivity for each quay side crane shall be measured by the number of total Container lifts handled by such crane when a vessel is berthed at the Port divided by the number of hours the vessel is at berth at the Port.

  • Furthermore it supports a strong IT structure for the set-up of all kinds of trials and tests in a table top environment.

  • When handling by a Quay crane in a container terminal considers a handling rate of 25 TEUs per hour, consideration of 24 TEUs per hour as the handling rate by a Floating Crane is found to be reasonable and hence, considered in the analysis.

  • It is, therefore, planned to replace one RMQC in 2016-17 and another one in 2017-18 (if required) with modern Quay crane which is capable of handling large container vessels, thereby maintaining present productivity levels.

  • For the terminal of this capacity, 20 m Quay crane is considered sufficient.

  • Approximately forty auto straddles are available for use throughout the automated yard at any given time.• Quay crane activities: Vessels are currently serviced at the site by nine quay cranes on Brotherson Dock.

  • Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures.

  • If the ship’s gears are used for loading/unloading containers from ship to shore or vice versa, rebate is calculated at 50% of Quay crane.

  • Handling by Quay crane including lashing / unlashing charges Note: Services include handling by quay crane and lashing / unlashing.(b).

  • Quay crane charges for one move i.e. Rs.1316/- should apply, whereas it has proposed Rs.1260/- only.

Related to Quay crane

  • Seaplane means an aeroplane capable normally of taking off from and alighting solely on water;

  • GAC20 means granular activated carbon filter beds with an empty-bed contact time of 20 minutes based on average daily flow and a carbon reactivation frequency of every 240 days.

  • MFET Limited means the company limited by guarantee (number 7121661) of that name, established for the purpose in particular of making payments in accordance with arrangements made with the Secretary of State to persons who have acquired HIV as a result of treatment by the NHS with blood or blood products;

  • LCC-300 Cost Centre I EXTERNAL WORKS Lump Sum Breakdown I15 : Gas Main Lump Sum Item LSI15.1 I15.1 : Gas Main Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Lump Sum Breakdown and for which a separate charge is required. The unit of measurement for any Contractor's Other Charge shall be "sum", with Quantity and Rate columns entered with "N/A". ------------------------------------------------------------------------------------------------------------------- Total of Lump Sum Item LSI15.1 *** ------------ *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • Child day center means a child day program offered to (i) two or more children under the age of 13 in a facility that is not the residence of the provider or of any of the children in care or (ii) 13 or more children at any location.

  • LCC-300 Cost Centre E Terminus Building - Structure Lump Sum Breakdown E4 : Station (GL X7-27/M-Q, 15.00m-21.96m) Lump Sum Item LSE4.4 E4.4 : Structural Steelwork Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Lump Sum Breakdown and for which a separate charge is required. The unit of measurement for any Contractor's Other Charges shall be "sum", with Quantity and Rate columns entered with "N/A". ---------------------------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSE4.4 *** ----------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • Basecoat means a coat of colored material, usually opaque, that is applied before graining inks, glazing coats, or other opaque finishing materials and is usually topcoated for protection.

  • H1, H2 etc means First Highest, Second Highest Offers etc. in Disposal Tenders means

  • LCC-300 Cost Centre L : EPIW - STRUCTURE (OPTION 1) Lump Sum Breakdown L4 : Widening of Boundary Patrol Road (Area D) (EPIW) (Option 1) Lump Sum Item LSL4.7 L4.7 : Diversion of Utilities Method-Related Charges The Contractor shall enter hereunder in detail any method related charges items in accordance with CESMM3 Section 7 --------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSL4.7 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • LCC-300 Cost Centre G Terminus Building : E&M Works Lump Sum Breakdown G4 : Plumbing and Drainage Lump Sum Item LSG4.4 G4.4 : Cold Water Installation Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Lump Sum Breakdown and for which a separate charge is required. The unit of measurement for any Contractor's Other Charge shall be "sum", with Quantity and Rate columns entered with "N/A". sum *** *** *** ------------------------------------------------------------------------------------------------ To Collection of Lump Sum Item LSG4.4 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • GAC10 means granular activated carbon filter beds with an empty-bed contact time of 10 minutes based on average daily flow and a carbon reactivation frequency of every 180 days, except that the reactivation frequency for GAC10 used as a best available technology for compliance with MCLs under subsection 9.2.1.2 shall be 120 days.

  • Drywell means an unlined or partially lined underground pit (regardless of geometry) into which drainage from roofs, basement floors, water softeners or other non-wastewater sources is discharged and from which the liquid seeps into the surrounding soil.

  • LCC-300 Cost Centre F Terminus Building - ABWF Lump Sum Breakdown F5 : Shared Facilities Lump Sum Item LSF5.1 F5.1 : Shared Facilities - ABWF Dense concrete blockwork; compressive strength 7.0N/mm2 stretcher bond; in cement/lime mortar; flush pointed; as Appendix AA to Particular Specification, section F10 Thickness: 140mm, U511.1 vertical straight walls m2 *** *** *** Thickness: 140mm; 2 hours fire rating U511.2 vertical straight walls m2 *** *** *** Ancillaries U581 joint reinforcement; 24 gauge galvanised expanded steel mesh; 300mm wide m *** *** *** U583 movement joints; fire rated filler; 140 mm in depth; as Drawing nr LCC300/31/A24/154, 156 m *** *** *** U586 fixings and ties; galvanised mild steel dove tail ties m2 *** *** *** U589 head restraint; galvanised mild steel angle; 70 x 70 x 3mm thick; sleeved and dowelled into blockwork at 2000mm centres m *** *** *** PAINTING Emulsion paint; with one coat thinned with water in accordance with manufacturer's recommendation and two unthinned coats; as Appendix AA to Particular Specification, section M60 Plaster and render V543 surfaces inclined at an angle exceeding 60 degrees to the horizontal m2 *** *** *** -------------------------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSF5.1 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • Highway means the entire width between the boundary lines of every way or place open to the use

  • one-way street means a street upon which vehicular traffic is limited to movement in one direction.

  • M2M Flowgate means Flowgates where constraints are jointly monitored and coordinated as defined and set forth in Schedule D to this Agreement.

  • Crosswalk means that part of a roadway at an intersection included within the connections of the

  • Cottage Sector Means a single dwelling that does not have a common facility for a multiple number of tenants.

  • Zone 3 means all of that part of the Lower Peninsula south of the line described in subdivision (bb).

  • Municipal Finance Management Act means the Local Government: Municipal Finance Management Act, 2003 (Act No. 56 of 2003);

  • MARPOL 73/78 means the International Convention for the Prevention of Pollution from Ships, 1973, as amended by the Protocol of 1978 relating thereto and by any other amendment in force thereafter;

  • PM2.5 means particulate matter with an aerodynamic diameter less than or equal to a nominal 2.5 micrometers as measured by a reference method based on 40 CFR Part 50 Appendix L and designated in accordance with 40 CFR Part 53 or by an equivalent method designated in accordance with 40 CFR Part 53.

  • Railway Corridor means, prior to the grant of a Special Railway Licence, the land for the route of the Railway the subject of that licence, access roads (other than Lateral Access Roads), areas from which stone, sand, clay and gravel may be taken, temporary accommodation facilities for the railway workforce, water bores and Additional Infrastructure (if any) which is the subject of a subsisting agreement pursuant to subclause (3)(a) and after the grant of the Special Railway Licence the land from time to time the subject of that Special Railway Licence;

  • Pistol means any firearm with a barrel less than sixteen inches in length, or is designed to be held and fired by the use of a single hand.

  • L1. L2 etc means First or second Lowest Offer etc."L1. L2 etc" means First or second Lowest Offer etc. "LC" means Letter of Credit"LC" means Letter of Credit

  • KIID means key investor information document;