Examples of QMP in a sentence
Payment for HMA Pavement Type LT, MT, and HT mixes is full compensation for providing HMA mixture designs; for preparing foundation; for furnishing, preparing, hauling, mixing, placing, and compacting mixture; for HMA PWL QMP testing and aggregate source testing; for warm mix asphalt additives or processes; for stabilizer, hydrated lime and liquid antistripping agent, if required; and for all materials including asphaltic materials.
For a density-only test strip, determination of mix conformance will be according to main production, i.e., HMA Pavement Percent Within Limits (PWL) QMP special provision.
The QMP may be one utilized by the Design-Build Firm, as part of their normal operation or it may be one specifically designed for this Project.
The Design- Build Firm shall submit a QMP within fifteen (15) working days following issuance of the written Notice to Proceed.
When applicable, align segment limits with the sublot limits used for testing under the QMP Concrete Pavement specification.
In addition the QMP shall establish a Quality Assurance (QA) program to confirm that the Quality Control procedures are followed.
Chapter 8 of the department’s construction and materials manual (CMM) provides additional detailed guidance for QMP work and describes required sampling and testing procedures.
C.4 TestingC.4.1 Run and Reduction Parameters(1) Enter the equipment-specific department-approved filter settings and parameters given in the approved profilers list on the department’s QMP ride web site.http://roadwaystandards.dot.wi.gov/standards/qmp/profilers.pdf C.4.2 Contractor Testing(1) Operate profilers within the manufacturer’s recommended speed tolerances.
All mainline density locations after test strip should have a longitudinal- as well as transverse-random number to determine location as detailed in the WisDOT Test Method for HMA PWL QMP Density Measurements for Main Production section of this document.]Individual locations are represented by the symbol as seen in Figure 1 above.
Production and placement control and inspection.2. Material sampling and testing.(5) Chapter 8 of the department’s construction and materials manual (CMM) provides additional detailed guidance for QMP work and describes required sampling and testing procedures.