Q10 definition

Q10. What does “network” refer to? Is it the coverage type? Is it what determines if a person has network coverage (Preferred Provider Organization [PPO] or Health Maintenance Organization [HMO])?
Q10 means the flood flow having a recurrence interval of 10 years or a 10% chance of occurring or being exceeded in any given year.
Q10. What does CMS consider to be a successful completion of the data exchange testing process? A10: At a minimum CMS requires the VDSA partner to be able to (1) submit an initial test MSP and Non-MSP Input File that can be processed to the satisfaction of the COB contractor, (2) receive and process a test MSP and Non-MSP Response File from the COB contractor, and (3) be able to submit a test Update MSP and Non MSP file to the COB contractor. We have delegated the authority to determine whether or not the VDSA partner has successfully completed the testing process to the COB contractor. Q11: How long does the testing process take? A11: Testing can begin as soon as a VDSA is executed by both Parties, and it takes place on a scheduled weekly basis. Under ideal circumstances, each testing cycle takes about a full week before the VDSA partner can be ready to submit the next test file. Testing will take place at the VDSA partner's preferred pace and can take a month or more to complete, depending on how quickly the VDSA partner can gather the necessary resources to meet the implementation requirements. VDSA partners should note that CMS's goal throughout the testing and implementation process is to ensure that the VDSA partner's first real production file is as accurate as possible. The accuracy of data on the first production file is more important than how quickly the VDSA partner can produce it. Q12: Other than stating that files can be exchanged quarterly with the option of exchanging non-MSP files on a monthly basis, there is no mention of the actual reporting schedule we would use.

Examples of Q10 in a sentence

  • For frontal impact, the abdomen of the Q1.5, Q3, Q6 and Q10 are instrumented using Abdominal Pressure Twin Sensors (APTS).

  • The deformation can be measured with a string potentiometer in Q1 and Q1.5 and an IR-TRACC sensors in Q3, Q6 and Q10.

  • The Pregnancy Leave of an Employee ends on a day earlier than the day provided for in Q.9 or Q.10 if the Employee gives the Employer at least four (4) weeks written notice of that day.

  • Q0 Q1 Q1.5 Q3 Q6 Q10 (design targets) Dimensions in mm Height of spacer device for positioning of dummy 173 ± 2 229 ± 2 237 ± 2 250 ± 2 270 ± 2 359 ± 2 Adjust the ECRS belt in accordance with the manufacturer's instructions, but to a tension of 250 ± 25 N above the adjuster force, with a deflection angle of the strap at the adjuster of 45 ± 5°, or alternatively, the angle prescribed by the manufacturer.

  • Table 7 Q0 Q1 Q1.5 Q3 Q6 Q10 (design targets) Dimensions in mm Height of spacer device for positioning of dummy 173 ± 2 229 ± 2 237 ± 2 250 ± 2 270 ± 2 359 ± 2 Adjust the ECRS belt in accordance with the manufacturer's instructions, but to a tension of 250 ± 25 N above the adjuster force, with a deflection angle of the strap at the adjuster of 45 ± 5°, or alternatively, the angle prescribed by the manufacturer.

  • Skimmer Basins shall provide adequate silt storage for 1800 cubic feet per disturbed acre with surface area equal to 325 square feet per cubic foot per second (cfs) of the peak inflow rate, Q10 or Q25, using the 10-year or 25-year peak rainfall data (NCDENR - Erosion and Sediment Control Planning and Design Manual or NOAA’s National Weather Service web site ▇▇▇▇://▇▇▇▇.▇▇▇.▇▇▇▇.▇▇▇/hdsc/pfds/orb/nc_pfds.html for partial duration (ARI) time series type).

  • Infiltration Basins shall provide adequate silt storage for 1800 cubic feet per disturbed acre with surface area equal to 325 square feet per cubic foot per second (cfs) of the peak inflow rate, Q10 or Q25, using the 10-year or 25-year peak rainfall data (NCDENR - Erosion and Sediment Control Planning and Design Manual or NOAA’s National Weather Service web site ▇▇▇▇://▇▇▇▇.▇▇▇.▇▇▇▇.▇▇▇/hdsc/pfds/orb/nc_pfds.html for partial duration (ARI) time series type).

  • Table 7 Dummy Q0 Q1 Q1.5 Q3 Q6 Q101 1 No lateral impact test is required for size range over 135 cm until Q10 dummy injury criteria for the lateral impact test are established.

  • This sparing of gut flora is expected to result in superiority over other CDI antibiotics by significantly reducing rates of recurrent disease (Q10) which remains the key clinical hurdle to achieving effective treatment of CDI.

  • Table 8 1 No lateral impact test using the Q10 dummy is required for i-Size booster seats with a size range upper limit between 125 cm and 135 cm.

Related to Q10

  • NI 52-107 means National Instrument 52-107 Acceptable Accounting Principles, Auditing Standards and Reporting Currency;

  • NI 45-106 means National Instrument 45-106 Prospectus Exemptions;

  • NI 52-110 means National Instrument 52-110 – Audit Committees;

  • NI 54-101 means National Instrument 54-101 – Communication with Beneficial Owners of Securities of a Reporting Issuer.

  • NI 45-102 means National Instrument 45-102 – Resale of Securities;