Examples of Purification plant in a sentence
No. Engg/10/2015-16, dt:02.12.2015PRESS NOTICEOn line “item rate” e-tenders under two bid system are invited on behalf of Food Corporation of India from the reputed Firms/manufacturers/Authorized dealers (Dealers ship certificate), MS&ME and SSI of State/Central Government, Etc., for the Supply & Installation of Water Purification plant of 250 LPH .
The main source of water for the scheme in question is the Politsi Water Purification plant which is located approximately 5km South-East of Modjadjiskloof within the jurisdiction of Greater Tzaneen Municipality.
Predicting the future course of house prices is difficult, if not impossible.
Further, RCD obtained under the s.8(4) Regime is held for a maximum of one year before being deleted.
Figure 16: Losses caused by Hydrometeorological Events in the Aqueducts and Sewage System Sector at National Level, per Component.PUMPINGSEDIMENTATIONLAGOON 3.0%STORAGE TANK 3.0%STATION 2.9% OTHERS 8.3% AQUEDUCT SYSTEM 33.7% PIPELINES 22.3%WATER INTAKE 26.8% Note: The category defined as “Others” includes: Purification plant, Treatment plant, Distribution lines, Wells, Headrace pipelines, Sewage Systems, Sand remover, and Submersible pumpSource: Flores Verdejo, R.
NAME OF WORK:- NAME OF WORK:- MOU-Providing safe drinking water facilities in FCI depots for the year 2015-16 SH:- Supply & Installation of Water Purification plant of 250 LPH at FSD KC DEPOT S.NO Supplier Signature:Designation: Asst General Manager(Engg) Date:Notice Inviting E-Tenders The Asst.
Each tender is to be in a sealed cover super scribed “NAME OF WORK:- MOU-Providing safe drinking water facilities in FCI depots for the year 2015-16 SH:- Supply & Installation of Water Purification plant of 250 LPH at FSD KC DEPOT “& addressed to AGM (Engg.), Food Corporation of India, Regional Office, HACA Bhavan, III Floor, Public Garden Road, Hyderabad- 500 00410.
Neath Water Purification plant is a direct filtration surface water treatment plant that draws its water from Georgian Bay.
It is of interest to specify other examples where condition (L) holds or provides a plausible approximation.ΣExample 3.1 (Saturated Specification).
The major challenge of this project is the unbundling of Capital assets, in other words, assets need to be broken down to major components,e.g. current Asset – Sewer Purification plant, need to be broken down to, Dam, Pump, Building, Pipe, Electrical works, etc.