Examples of Pumped in a sentence
Pumped or overland flows of water are discharged so as not to cause, permit or allow erosion before the commencement of work (and until issue of the occupation certificate).
Pumped concrete, synthetic fiber concrete, architectural concrete, concrete required to be watertight, and concrete with a water/cement ratio below 0.50 use high-range water-reducing admixture (superplasticizer).
In addition to the common elements listed in Section 30.5.2.1, Scheduling Coordinators submitting Supply Bids for Participating Loads, which includes Pumping Load or Pumped-Storage Hydro Units, may include the following components: Pumping Level (MW), Minimum Load Bid (Generation mode only of a Pumped- Storage Hydro Unit), Load Distribution Factor, Ramp Rate, Energy Limit, Pumping Cost, and Pump Shut- Down Costs.
OPG’s regulated assets include:• DeCew Falls I and II;• the Niagara River plants – Sir Adam Beck I, II, and Pumped Generating Station;• the R.H. Saunders Hydroelectric Generating Station on the St. Lawrence River;• the Pickering Nuclear Generating Station consisting of Pickering A and Pickering B; and• the Darlington Nuclear Generating Station.We have created two charge types to implement the adjustments for nuclear generation and for baseload hydroelectric generation.
SCHEDULE C Variable Cost Payment for All Conditions Part 4 for Pumped Storage Hydro Units For each month and each Unit, the Variable Cost Payment for Billable MWh from the Unit pursuant to Nonmarket Transactions during that Month shall be the amount calculated in accordance with the following formula: Variable Cost Payment = A.
High Photoluminescence Efficiency and Optically Pumped Lasing in Solution-Processed Mixed Halide Perovskite Semiconductors.
Pumped Concrete.THE FOLLOWING IS ADDED: As per the provisions of 914.04, fresh mixed concrete shall be sampled according to the requirements of AASHTO T 141.
Total Nuclear Total Coal* Oil & Natural Gas * Includes figures for Pumped Storage.
For Pumped Storage Hydro resources, fuel cost shall be determined based on the amount of energy necessary to pump from the lower reservoir to the upper reservoir.
Pumped groundwater shall not be allowed to discharge off-site (e.g. adjoining roads, stormwater system, sewerage system, etc.) without the controlling authority’s approval and/or owner’s consent/s.