PS&E Phase definition

PS&E Phase means the phase during which the plans, specifications, and estimates for the PROJECT will be determined and produced. Right-of-Way design, appraisal and engineering work will also be completed during this phase. The PS&E Phase scope of work to be performed by the IMPLEMENTING AGENCY is defined in Attachment 4.

Examples of PS&E Phase in a sentence

  • The preliminary engineering will also include determination of utility conflicts, establishing a Right of Way Requirements Map, and aerial and field surveys, among other things to support the future Plans, Specifications, and Estimate (PS&E) Phase.

  • The City may provide a City oversight engineer or other City staff to oversee any PS&E Phase or ROW Phase work or services at its own cost.

  • DAP and PS&E Phase Gates The REC is responsible to certify that all required QC documents have been completed and appropriate signatures have been provided.

  • Overall scope of work during PS&E Phase will include preparation of a Geotechnical Design Report for the roadway work, slopes, retaining walls and embankments.

  • The purpose of this MOA is solely to set forth the parties’ agreement of the cost sharing formula for the consultant’s and other related cost for the review of the PS&E Phase documents.

  • Upon completion of the State’s review, the Engineer will address the State’s comments and submit a Final Interim Working Drawing to be the basis for PS&E (Phase 5 and Phase 6).

  • In the event that either Dublin or Livermore annexes the unincorporated segment of the ROADWAY and the bridge, the agency that annexes the area shall reimburse the other City for the costs incurred for the review of the PS&E Phase documents.

  • During the PS&E Phase, The ENGINEER shall prepare plans and compile specifications for the construction of the utility adjustments.

  • The following proposed geotechnical studies are planned to be performed during PS&E Phase: ▪ Foundation Report and Log of Test Borings (Bridge): ▇▇▇▇▇▇ will prepare foundation report and log of test borings for the POC structure.

  • Phase 10 – Final PSE Phase 5 Fee Estimate $8,640 The contract budget for this phase of work was exhausted by additional meetings, updates, design efforts, and ad hoc requests during the project suspension period.

Related to PS&E Phase

  • Development Phase means the period before a vehicle type is type approved.

  • Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.

  • Design Phase means the period during which the Transporter shall prepare a draft project proposal for publication in accordance with section 4.3;

  • Phase 1 means the phase of the ATP comprised of: (1) improvements to the State Street Substation; (2) construction of the Proposed Line; (3) the rebuilding of NYSEG’s existing Lines 971 and ▇▇▇ ▇▇▇▇▇ ▇▇ ▇▇▇▇▇▇▇▇ ▇▇▇▇ ▇▇ the NYSEG ROW to allow for construction of the Proposed Line as intended; (4) improvements to the Elbridge Substation to accept the Proposed Line; and (5) National Grid’s conveyance to NYSEG of the NYSEG Acquired ROW and such other land interests as contemplated by the Purchase and Sale Agreement.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.