Project Utilities definition

Project Utilities means all services, amenities and utilities, such as and amenities such as water supply, sewerage, storm water drainage, generator, electricity supply, lighting, air conditioning, landscaping, fountains, open parking, exhibition ground etc. which the Developer is required to construct and maintain on the Site, the Redevelopment Land and Station Development Land and “Commercial Development Project Utilities”, “Redevelopment Project Utilities” and “Station Development Project Utilities”, shall be construed accordingly;
Project Utilities shall include provision of infrastructure services such as internal roads, street lighting, sewerage, drainage, power supply, rain water harvesting, distribution of water supply, air-conditioning within Site and its linkages and connectivity with external utilities provided by respective governmental utilities at the Project boundary;
Project Utilities means all the amenities and facilities situated on the Residential Property, as described in Schedule-C;

Examples of Project Utilities in a sentence

  • Further the Maintenance and Replacement Plan shall also be consistent with the requirements of as built drawings and maintenance manuals, if any, supplied by Authority (for the Station Assets and Station Project Utilities in the Station Area.

  • Subject to the approval of the MOR and/ or Railway Administration (and any conditions specified by the MOR and/ or Railway Administration in its approval), the major maintenance and replacement of the Station Assets and Station Project Utilities in the Station Area shall be undertaken in accordance with the approved Maintenance and Replacement Plan.

  • The Developer shall not, at any time during the Term, assert any ownership rights and/or lease rights over the Project Land or the Assets and Project Utilities developed thereupon, and/ or any other interests in the Project Land (save and except the Lease Rights to the Commercial Development Assets as set out under the Agreement), and/or any built-up structures and all other assets erected on the Project Land and/or shops etc., in /at the Station.

  • The Sinking Fund shall be exclusively used for mid term replacement and upgradation of machines, assets, equipments and fixtures installed as part of Station Development Project Utilities including but not limited to lifts, elevators, escalators, power-back / DG up sets, HVAC, electric sub-stations, pumps, fire fighting, plumbing, fittings and water supply systems, internal and external electrical fittings and controls, any other plant/equipment of capital nature etc.

  • Project Utilities – Section 015000-Construction Facilities and Temporary Controls, 3.

  • The Developer shall not start Commercial Operation of the Commercial Development Project or permit usage of the Asset and the Commercial Development Project Utilities until the Developer has received the Completion Clearance or the Provisional Completion Clearance (subject to Article 22) in respect of the Commercial Development Project.

  • The proceeds from all insurance claims, except life and injury, shall be paid to the Developer by a/c payee cheque drawn in its favour and the Developer shall use such amount for any necessary repair, reconstruction, reinstatement, replacement, improvement or delivery of the Assets and Project Utilities, and the balance remaining, if any, shall be applied in accordance with the provisions contained in this behalf in the Financing Agreements.

  • The Developer expressly agrees and undertakes that the Developer shall himself arrange for financing and/or meeting all financing requirements through suitable debt, equity or any other acceptable financial mode in order to comply with its obligations under the Development Agreement including but not limited to its obligations to arrange the financing for the construction of the Assets and Project Utilities.

  • The BSHB shall, within 15 (fifteen) days of the receipt of the Completion Date Notice shall issue a completion certificate on the basis of all certifications acquired by the Developer from other relevant governmental agency, permitting the Developer to commence utilization of the Assets and Project Utilities constructed upon the Site ("Completion Certificate") substantially in the form as set out in Schedule II.

  • Project Utilities: Site utilities such as temporary electric, water, and sanitary.


More Definitions of Project Utilities

Project Utilities shall have the meaning given to such term in Section 3.2(a) hereof. “Sales Tax” means, collectively, the City Sales Tax and the District Sales Tax.‌
Project Utilities shal mean al services, amenities and utilities, such as and amenities such as water supply, sewerage, storm water drainage, generator, electricity supply, lighting, air conditioning, landscaping, fountains, open parking, exhibition ground etc. which the Developer is required to construct and maintain on the Site, the Redevelopment Land and Station Development Land and “Commercial Development Project Utilities”, “Redevelopment Project Utilities” and “Station Development Project Utilities”, shal be construed accordingly;
Project Utilities means all services, amenities and utilities, such as water supply, sewerage, storm water drainage, generator / electricity supply, lighting, air conditioning, landscaping, fountains, open parking, exhibition ground etc. which the Facility Manager is required to maintain on the Station Area. For the avoidance of doubt, the term “Project Utilities” shall include (i) such portion of the Project Utilities as handed over to the Facility Manager on the Appointed Date and (ii) such portion of the Project Utilities as and when constructed/ completed/ renovated/ repaired by IRSDC or a developer/contractor appointed by IRSDC;;
Project Utilities means all services, amenities and utilities, such as water supply, sewerage, storm water drainage, generator / electricity supply, lighting, air conditioning, landscaping, fountains, open parking, exhibition ground etc. which the Facility Manager is required to maintain on the Station Area. [For the avoidance of doubt, the term “Project Utilities” shall include (i) such portion of the Project Utilities as handed over to the Facility Manager on the Appointed Date and (ii) such portion of the Project Utilities as and when constructed/ completed/ renovated/ repaired as part of the Station Development Project and handed over to the Facility Manager]30;
Project Utilities shall include (i) such portion of the Project Utilities as handed over to the Facility Manager on the Appointed Date and (ii) such portion of the Project Utilities as and when constructed/ completed/ renovated/ repaired as part of the Station Development Project and handed over to the Facility Manager]30;
Project Utilities means the utilities enumerated in Annexure D hereto;

Related to Project Utilities

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Water utility means a public utility as defined in

  • Projects means the projects identified in Exhibit A to the Agreement and all other projects, any costs of which are included in a Transitional Capital Plan pursuant to the Act or are Recovery Costs, and financed, by payment or reimbursement, with the proceeds of Bonds or Notes.

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Infrastructure project means any construction or acquisition of treatment works,

  • Critical Energy Infrastructure Information means all information, whether furnished before or after the mutual execution of this Agreement, whether oral, written or recorded/electronic, and regardless of the manner in which it is furnished, that is marked “CEII” or “Critical Energy Infrastructure Information” or which under all of the circumstances should be treated as such in accordance with the definition of CEII in 18 C.F.R. § 388.13(c)(1). The Receiving Party shall maintain all CEII in a secure place. The Receiving Party shall treat CEII received under this agreement in accordance with its own procedures for protecting CEII and shall not disclose CEII to anyone except its Authorized Representatives.

  • Stormwater system means constructed and natural features which function together as a system to collect, convey, channel, hold, inhibit, retain, detain, infiltrate, divert, treat, or filter stormwater. “Stormwater system” includes both public and privately owned features.

  • Energy project means the installation or modification of an energy efficiency improvement or the acquisition, installation, or improvement of a renewable energy system.

  • Power Plant means a facility for the generation of

  • Renewable energy project means (A) a project

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Environmental Infrastructure Facilities means Wastewater Treatment Facilities, Stormwater Management Facilities or Water Supply Facilities (as such terms are defined in the Regulations).

  • Building Energy Benchmarking means the process of measuring a building’s Energy use, tracking that use over time, and comparing performance to similar buildings.

  • Generating Facilities means Interconnection Customer’s device for the production and/or storage for later injection of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities. Generation Interconnection Customer:

  • Project Facilities means the facilities, equipment and vehicles provided under the Project;

  • Project Engineer means the surveyor or engineer employed by or private

  • Electric utility steam generating unit means any steam electric generating unit that is constructed for the purpose of supplying more than one-third of its potential electric output capacity and more than 25 MW electrical output to any utility power distribution system for sale. Any steam supplied to a steam distribution system for the purpose of providing steam to a steam-electric generator that would produce electrical energy for sale is also considered in determining the electrical energy output capacity of the affected facility.

  • New Project means (a) each facility or operating location which is either a new facility, location or office or an expansion, relocation, remodeling or substantial modernization of an existing facility, location or office owned by the Borrower or its Subsidiaries which in fact commences operations and (b) each creation (in one or a series of related transactions) of a business unit to the extent such business unit commences operations or each expansion (in one or a series of related transactions) of business into a new market.

  • The Project Plan means the document to be developed by the Supplier and approved by the Purchaser, pursuant to GCC Clause 19, based on the requirements of the Contract and the Preliminary Project Plan included in the Supplier’s bid. The “Agreed and Finalized Project Plan” is the version of the Project Plan approved by the Purchaser, in accordance with GCC Clause 19.2. Should the Project Plan conflict with the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.

  • Project Work means the work required to complete the Project.

  • Infrastructure means infrastructure serving the County and improved or unimproved real estate and personal property, including machinery and equipment, used in the operation of the Project, within the meaning of Section 4-29-68 of the Code.

  • Construction Contractor means a person who undertakes to or offers to undertake to, or purports to have the capacity to undertake to, or submits a bid to, or does himself or by or through others, construct, alter, repair, add to, subtract from, improve, move, wreck, or demolish any building, highway, road, railroad, excavation, or other structure, project, development, or improvement to real property, or to do any part thereof. "Construction contractor" includes subcontractors, specialty contractors, prime contractors, and any person receiving consideration for the general supervision and/or coordination of such a construction project except for remediation contracting. This definition shall govern without regard to whether or not the construction contractor is acting in fulfillment of a contract.

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • Project Common Areas as used in this Lease, shall mean the portion of the Project designated as such in the Site Plan. The Project Common Areas shall consist of all parking facilities, entrances and exits, driveways, exterior walkways, first-class landscaped and hardscaped areas which are generally consistent with the quality of landscaped and hardscaped areas of Comparable Buildings in existence as of the date of this Lease, open space areas and plazas on the real property comprising the Project. The term "BUILDING COMMON AREAS," as used in this Lease, shall mean the portions of the Common Areas located within any building in the Project not entirely leased by Tenant, which Building Common Areas shall be reasonably designated as such by Landlord. Notwithstanding the foregoing and subject to (i) Landlord's approval, which approval (as indicated in Section 29.4 below) shall not be unreasonably withheld or delayed, (ii) the CC&R's, and (iii) all terms of this Lease regarding Hazardous Materials, Tenant may install or locate such items as benches, patio tables, bike racks, above-ground generators, security cameras and the like (collectively, "MISCELLANEOUS COMMON AREA ITEMS") at Tenant's sole cost in the Common Areas or on the exterior of the Building, as applicable, provided that Tenant removes such items upon the expiration or earlier termination of this Lease and repairs any damage to the Common Areas or the exterior of the Building (as applicable) resulting from such removal. If Tenant fails to remove any Miscellaneous Common Area Item or to repair any damage resulting from such removal upon the expiration or earlier termination of this Lease, Landlord may do so and may charge Landlord's actual cost thereof to Tenant. The manner in which the Common Areas are maintained and operated shall be in accordance with a standard which is not less than that customarily followed in the operation and maintenance of first class mid-rise office buildings located within the University Towne Center (i.e., the area from two (2) blocks to the North of La Jolla Village Drive to two (2) blocks to the South of La Jolla Village Drive between the I-5 and I-805 freeways), Del Mar, Carmel Valley and Torrey Hills geographical areas, provided that Landlord shall manage, maintain and operate the same in a manner consistent with that of Comparable Buildings, and the use thereof shall be subject to such rules and regulations as Landlord reasonably may make from time to time. As used herein, "COMPARABLE BUILDINGS" shall mean the first class mid-rise office buildings (now existing or subsequently constructed) within the projects located within the University Towne Center, Del Mar, Carmel Valley and Torrey Hills geographical areas and having substantially similar characteristics to the Building pertaining to size, age, accessibility, design, quality, amenities and tenancies. Landlord reserves the right to make alterations or additions to, or to change the location of, elements of the Project and the Common Areas, provided that if any such changes might affect Tenant's use of the Premises (in other than an immaterial manner), Landlord obtains Tenant's prior written approval of any such alterations, additions and changes and such alterations, additions and changes do not unreasonably interfere with Tenant's access to the Premises. Except when and where Tenant's right of access is specifically excluded in this Lease, Tenant shall have the right of access to the Building and the parking facilities twenty-four (24) hours per day, seven (7) days per week during the Lease Term. PEREGRINE SYSTEMS CORPORATE CENTER [Peregrine Systems]